Search:

Type: Posts; User: jimmilegs

Search: Search took 0.04 seconds.

  1. Sticky: Final segment at Argyll Rd / 83 St is done.

    Final segment at Argyll Rd / 83 St is done.
  2. Replies
    46
    Views
    5,629

    Since the current terminal is design for 9...

    Since the current terminal is design for 9 million capacity, it looks like they could reach capacity within 2 or 3 years at this growth rate. I wonder if YEG has plans to begin construction soon on...
  3. Here is the response I got from COE. Seems like...

    Here is the response I got from COE. Seems like a reasonable approach by the city's planning department ...

    "The timeline for the development allowed for in the Stadium Station ARP is long term...
  4. It appears they're simply renovating the existing...

    It appears they're simply renovating the existing Stadium LRT Station. Why are they not using this opportunity to relocate the station to the "ideal" TOD location (~400m South), according to the...
  5. Replies
    132
    Views
    13,577

    Perhaps, but a curved bridge is much more...

    Perhaps, but a curved bridge is much more expensive than a straight bridge. Considering this is twice as tall and three times longer than the $150M Walterdale, the cost of the bridge will be a major...
  6. Replies
    132
    Views
    13,577

    As for Kinsman Park, the piers could be spaced to...

    As for Kinsman Park, the piers could be spaced to minimize disruption - the sports fields could be reoriented to either side of the new bridge.

    HSR is only if it becomes a reality as part of our...
  7. Replies
    132
    Views
    13,577

    This is my concept for replacing the HLB in ~20...

    This is my concept for replacing the HLB in ~20 years when it's time to construct the Centre LRT and the HLB is due for major rehab or replacement ...

    https://i.imgur.com/1tMUTmH.jpg
  8. Replies
    1,656
    Views
    208,229

    I attended a conference earlier this week with a...

    I attended a conference earlier this week with a presentation from City of Edmonton about this project. From what I remember, it was stated that the next couple of construction seasons will be...
  9. Replies
    5,588
    Views
    800,259

    Any rumour of an Oilers Store for the Ice...

    Any rumour of an Oilers Store for the Ice District that's public access (i.e. not inside Rogers Place)?
  10. Replies
    1,759
    Views
    305,380

    Pedestrian bridge over Whitemud Drive from...

    Pedestrian bridge over Whitemud Drive from Laurier Heights to Quennel.
  11. ^ I drove by earlier today and saw a fire hydrant...

    ^ I drove by earlier today and saw a fire hydrant leaking water and EPCOR employees trying to get it shut off.
  12. Replies
    43
    Views
    3,146

    They are both ground water monitoring wells....

    They are both ground water monitoring wells. Either flush mount, or the ones with the red metal casings are protecting the stick up wells.
  13. Replies
    43
    Views
    3,146

    They are ground water monitoring wells.

    They are ground water monitoring wells.
  14. The Great Human Odyssey Musical Score - Recorded in Edmonton

    Interesting mini documentary on the musical score for the upcoming CBC series The Great Human Odyssey ... recorded at the Winspear Centre in Edmonton:
    https://vimeo.com/116562391
  15. Gateway park and the oil rig visitor centre was...

    Gateway park and the oil rig visitor centre was originally supposed to be eliminated during this phase of construction, since they were going to re-align Hwy 2 right through the middle of it and add...
  16. Replies
    67
    Views
    7,244

    This is final stage paving. They usually wait a...

    This is final stage paving. They usually wait a year or two to let the new construction settle before placing the final top lift of pavement and smoothing out any dips. It makes for a better long...
Results 1 to 16 of 18