Thread: Valley Line LRT | Downtown to Millwoods | Under Construction

  1. #7501
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,488

    Default

    Quote Originally Posted by rupikhalon001 View Post
    Immediately east of 97 st they have dug down a lot ! Any idea why ? The tracks will be at grade a few blocks east. Moving utilities perhaps ?
    Water retention tank.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  2. #7502
    Becoming a C2E Power Poster
    Join Date
    Sep 2008
    Location
    Edmonton
    Posts
    467

    Default

    Did it have to be so deep ? Why not tie into existing infrastructure ? I would have assumed that ideally there would be nothing under the tracks. Now in the future if any work needs to be done on the retention tanks it could impact the trains. Usually things are moved out of the way of tracks.
    I was really surprised to see that excavation, especially when you see some of he track bed further east is almost at grade. I'll take a look at Trans Ed website to see if there is anything there.
    Thx

  3. #7503
    C2E Stole my Heart!!!!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    8,071

    Default

    All this rain has got to be affecting their progress. The long term forecast doesn’t look much better.

  4. #7504
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,399

    Default

    East of 97 Street, the Quarters Station is being built.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  5. #7505
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    32,192

    Default

    100 Street intersection updates





    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  6. #7506
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,399

    Default

    One thing that I like seeing is the sidewalk construction on Connors Road. This is a much-needed access to the river valley.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  7. #7507
    I'd rather C2E than work!
    Join Date
    Jan 2009
    Location
    Edmonton
    Posts
    6,337

    Default

    Quote Originally Posted by Drumbones View Post
    All this rain has got to be affecting their progress. The long term forecast doesn’t look much better.
    It's slowing everything down..on the whole construction isn't the best in Edmonton right now, unless you're a huge company with lots of inside work.
    Animals are my passion.

  8. #7508
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    11,395

    Default

    Quote Originally Posted by The_Cat View Post
    One thing that I like seeing is the sidewalk construction on Connors Road. This is a much-needed access to the river valley.
    Which side is the sidewalk going on.

  9. #7509
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,399

    Default

    The inside (south side) of Connors Road.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  10. #7510

    Default

    Wasn't there always a sidewalk along the southside of Connors Road?

    edit: Meant northside of road. Doh!
    Last edited by Medwards; 05-07-2019 at 03:48 PM.

  11. #7511
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    11,395

    Default

    From what I recall there was only a sidewalk on the northside, hillside.

  12. #7512
    C2E Hard Core Contributor
    Join Date
    Jan 2012
    Location
    Sherwood park
    Posts
    2,685

    Default

    Google Maps confirms there was a sidewalk on the northside of Connors Road.. nothing on the uphill side.

  13. #7513
    C2E Continued Contributor
    Join Date
    Jun 2009
    Location
    Beaumont, ab
    Posts
    1,002

    Default

    Uh oh spaghetti-O's - just see that Bombardier has laid off 550 workers in Thunder Bay - isn't that where they're making our trains?

  14. #7514
    C2E Stole my Heart!!!!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    8,071

    Default

    I saw that too and was wondering

  15. #7515
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton, Alberta
    Posts
    4,777

    Default

    Quote Originally Posted by maclac View Post
    Uh oh spaghetti-O's - just see that Bombardier has laid off 550 workers in Thunder Bay - isn't that where they're making our trains?
    No Kingston
    “Canada is the only country in the world that knows how to live without an identity,”-Marshall McLuhan

  16. #7516
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,771

    Default

    Full Bombardier lay off is here.

    https://www.cbc.ca/news/canada/thunder-bay/bombardier-layoffs-thunder-bay-1.5206009

    I think our cars have already been built waiting to take delivery. I hope.

    Mom said I should not talk to cretins!

  17. #7517
    C2E Continued Contributor
    Join Date
    Jun 2009
    Location
    Beaumont, ab
    Posts
    1,002

    Default

    Well if they're made in Kingston - which I don't think they are - why would you be "hoping" that they were made already?

  18. #7518
    Administrator *
    Join Date
    Nov 2011
    Location
    Queen Mary Park, Edmonton
    Posts
    2,758

    Default

    Our trains are being made in Kingston, not Thunder Bay. The whole reason they are laying off is because they have no more orders to fulfill. Don’t worry, this doesn’t affect us at all.

  19. #7519
    C2E Continued Contributor
    Join Date
    Jun 2009
    Location
    Beaumont, ab
    Posts
    1,002

    Default

    Good...one less obstacle that our group needs....could care less if Bombardier went bankrupt after our order was filled....

  20. #7520
    C2E Continued Contributor
    Join Date
    May 2007
    Location
    Royal Gardens
    Posts
    1,719

    Default

    Intersection at 100 St has the bricks being laid. Hopefully with decent weather they’ll open up a week early like 101 St.
    My antidepressent drug of choice is running. Cheaper with less side effects!

  21. #7521
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    32,192

    Default

    I will have to go for another photography session if I have the time.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  22. #7522
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    11,395

    Default

    ^me too

  23. #7523
    C2E Continued Contributor
    Join Date
    Jun 2009
    Location
    Beaumont, ab
    Posts
    1,002

    Default

    Lets get at 'er boys...chop, chop

  24. #7524
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,771

    Default

    ^ I still think we should have bought our cars from Siemens. The Avenio types of cars would have been great here and we have had a good relationship with Siemens in the past.

    https://new.siemens.com/global/en/products/mobility/rail-solutions/rolling-stock/trams-and-light-rail/avenio.html


    Mom said I should not talk to cretins!

  25. #7525
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,771

    Default

    These photos that SDM and others are posting here on this project are awesome. Thanks for posting them boys, keep up the good work.
    Mom said I should not talk to cretins!

  26. #7526
    C2E Continued Contributor
    Join Date
    Jun 2009
    Location
    Beaumont, ab
    Posts
    1,002

    Default

    Yikes, looks like our fearless leader 'ol Kenney wants to put the brakes on Calgary's Green Line.....which is good since we lost our SuperLab - Sh*tkicker town can lose something as well........

  27. #7527
    I'd rather C2E than work!
    Join Date
    Nov 2006
    Location
    Edmonton, Canada
    Posts
    5,997

    Default

    Yeah, the Green Line has become a major, divisive issue down there.

    As for the Valley Line cars evaneo - that wasn't the city's decision. The decision was that of the P3 consortium that won the bidding.
    ... gobsmacked

  28. #7528

    Default

    Expect Valley West to also be on the chopping block.

  29. #7529
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,771

    Default

    Quote Originally Posted by McBoo View Post
    Yeah, the Green Line has become a major, divisive issue down there.

    As for the Valley Line cars evaneo - that wasn't the city's decision. The decision was that of the P3 consortium that won the bidding.
    Thanks. I didn't think that the City had anything to do with the Valley line cars contract. As for Calgary's Green line its proposed to be a $7b project. We have funding in place already for WLRT don't we?
    Mom said I should not talk to cretins!

  30. #7530

    Default

    We HAD funding in place.

    Bit hard to find $1.04B in Provincial money from the climate leadership plan now that we have no carbon tax, climate leadership, nor plan.

    https://www.cbc.ca/news/canada/edmon...nton-1.4887712

    The projects are made possible through the NDP's climate leadership plan, which "some folks" would like to see cancelled, Notley said."If we listen to them all of this construction would be stopped," Notley said. "We don't agree with that approach."
    "Some folks" are now running Alberta.
    Giving less of a damn than ever… Can't laugh at the ignorant if you ignore them!

  31. #7531
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,771

    Default

    I was never a fan of this carbon tax repeal scheme of Kenney's. It was revenue neutral. Even Jim Prentice was thinking about a made in Alberta carbon tax solution. Its in his book.

    All that R&D work gone to waste. So then is WLRT line axed? Is Blatchford not far behind?
    Mom said I should not talk to cretins!

  32. #7532
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    32,192

    Default

    Quote Originally Posted by Sonic Death Monkey View Post
    I will have to go for another photography session if I have the time.
    Earlier this afternoon with a few minutes to spare...

    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  33. #7533
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,399

    Default

    Quote Originally Posted by envaneo View Post
    I was never a fan of this carbon tax repeal scheme of Kenney's. It was revenue neutral. Even Jim Prentice was thinking about a made in Alberta carbon tax solution. Its in his book.

    All that R&D work gone to waste. So then is WLRT line axed? Is Blatchford not far behind?
    The LRT is still 2/3’s funded by the municipal and federal governments. Edmonton should fight this if the Valley Line LRT gets axed!
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  34. #7534
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,399

    Default

    ^^ One thing I like about the new intersections is that the sidewalks have better wheelchair and walker access with the streets.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  35. #7535
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,771

    Default

    Quote Originally Posted by The_Cat View Post
    Quote Originally Posted by envaneo View Post
    I was never a fan of this carbon tax repeal scheme of Kenney's. It was revenue neutral. Even Jim Prentice was thinking about a made in Alberta carbon tax solution. Its in his book.

    All that R&D work gone to waste. So then is WLRT line axed? Is Blatchford not far behind?
    The LRT is still 2/3’s funded by the municipal and federal governments. Edmonton should fight this if the Valley Line LRT gets axed!
    Thanks. The _Cat.

    Better to build with 2/3rds of the existing funding in place then just let the WLRT languish waiting for the rest. Besides if there is a new (fingers crossed) federal administration, then chances are they could make up the difference as the line is being built.
    Mom said I should not talk to cretins!

  36. #7536
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,771

    Default

    Great photo above. One for city archives for sure.
    Mom said I should not talk to cretins!

  37. #7537

    Default

    The WLRT plan calls for a storage facility at the western terminus. A bit hard to include that if you can only build 2/3 of the line. You could expand theoretically expand the new SE storage faility but it's already under construction and changes would have to come out of the budget for the SE line.

  38. #7538

    Default

    Drove the hole length of the new line. quite impressed by the amount of work the last few months. the new station on 75st is going to be spectacular. the few slow section line Connors hill and the bridge now seem to be moving along. 100st may be open in a week or 2.

  39. #7539
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    11,395

    Default

    I just hope they can finish paving at a couple south side intersections that could be opened very soon.
    LRT is our future, time to push forward.

  40. #7540
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,488

    Default

    Apparently the 100st work is ahead of schedule.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  41. #7541

    Default

    One intersection ahead of schedule, the entire line a year behind.
    Giving less of a damn than ever… Can't laugh at the ignorant if you ignore them!

  42. #7542
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,771

    Default

    Quote Originally Posted by kkozoriz View Post
    The WLRT plan calls for a storage facility at the western terminus. A bit hard to include that if you can only build 2/3 of the line. You could expand theoretically expand the new SE storage faility but it's already under construction and changes would have to come out of the budget for the SE line.
    Then build half but that would take it to about Jasper Place terminal
    Mom said I should not talk to cretins!

  43. #7543
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,399

    Default

    Quote Originally Posted by IanO View Post
    Apparently the 100st work is ahead of schedule.
    Which is quite impressive considering the rainy weather. A lot of the flyover girders by Davies Station are also up, and the first concrete was poured for the Bonnie Doon traffic circle intersection.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  44. #7544

    Default

    Quote Originally Posted by envaneo View Post
    Quote Originally Posted by kkozoriz View Post
    The WLRT plan calls for a storage facility at the western terminus. A bit hard to include that if you can only build 2/3 of the line. You could expand theoretically expand the new SE storage faility but it's already under construction and changes would have to come out of the budget for the SE line.
    Then build half but that would take it to about Jasper Place terminal
    The question remains if the SE yard has space to allow those addition trains to be stored and maintained there. If not, the city would either have to fund the expansion itself or go to the province and feds for a cost sharing which would take time. They can't just tack it onto the existing contract without opening a huge can of worms.

  45. #7545
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    11,395

    Default

    I have to admit that I have been pleased to see lots of the concrete track bases south of Bonnie Doon in poured and in place already. If they can get certain stretches completely finished, minus maybe the actual cantenary lines, it would go a long ways in public relations in regards to not having as many construction sites and delays on the southside.

    They now have all the bridge spans south of the Wagner station in place so it would be nice to finish the curbs and roadway on 75st to its final configuration and let traffic better there again.

  46. #7546
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,771

    Default

    Quote Originally Posted by kkozoriz View Post
    Quote Originally Posted by envaneo View Post
    Quote Originally Posted by kkozoriz View Post
    The WLRT plan calls for a storage facility at the western terminus. A bit hard to include that if you can only build 2/3 of the line. You could expand theoretically expand the new SE storage faility but it's already under construction and changes would have to come out of the budget for the SE line.
    Then build half but that would take it to about Jasper Place terminal
    The question remains if the SE yard has space to allow those addition trains to be stored and maintained there. If not, the city would either have to fund the expansion itself or go to the province and feds for a cost sharing which would take time. They can't just tack it onto the existing contract without opening a huge can of worms.
    Shouldn't there be enough room for all LRT low floor cars along both Valley and WLRT in the Gary Wright maintenance facility currently under construction? If a car breaks down along WLRT, why not dispatch a team from Mitchell? I'm sure Valley/WLRT has overflow track built into the design for emergency like Capital...right?
    Mom said I should not talk to cretins!

  47. #7547

    Default

    How are they not going to have ice dam problems on the tracks in winter time with the way they are pouring the concrete right up to the rails at same elevation? Plus in Millwoods I'm seeing areas where hills could easily lead to pooling areas. Much like roads experience when the road surface is not appreciably elevated.

    Are we doing a surface rail build out with no thoughts to this being a winter climate or one that is predisposed to really bad storms and intense rains?
    "if god exists and he allowed that to happen, then its better that he doesn't exist"

  48. #7548

    Default

    Quote Originally Posted by Replacement View Post
    How are they not going to have ice dam problems on the tracks in winter time with the way they are pouring the concrete right up to the rails at same elevation? Plus in Millwoods I'm seeing areas where hills could easily lead to pooling areas. Much like roads experience when the road surface is not appreciably elevated.

    Are we doing a surface rail build out with no thoughts to this being a winter climate or one that is predisposed to really bad storms and intense rains?
    Track snow clearing equipment, drainage installed in median slabs and LRV mass should take care of it

  49. #7549

    Default

    Quote Originally Posted by envaneo View Post
    Quote Originally Posted by kkozoriz View Post
    Quote Originally Posted by envaneo View Post
    Quote Originally Posted by kkozoriz View Post
    The WLRT plan calls for a storage facility at the western terminus. A bit hard to include that if you can only build 2/3 of the line. You could expand theoretically expand the new SE storage faility but it's already under construction and changes would have to come out of the budget for the SE line.
    Then build half but that would take it to about Jasper Place terminal
    The question remains if the SE yard has space to allow those addition trains to be stored and maintained there. If not, the city would either have to fund the expansion itself or go to the province and feds for a cost sharing which would take time. They can't just tack it onto the existing contract without opening a huge can of worms.
    Shouldn't there be enough room for all LRT low floor cars along both Valley and WLRT in the Gary Wright maintenance facility currently under construction? If a car breaks down along WLRT, why not dispatch a team from Mitchell? I'm sure Valley/WLRT has overflow track built into the design for emergency like Capital...right?
    There might be space, there might not be. It depends on how much space they've allocated. The plan has always been that there would be a storage yard at the western end of the Valley Line so there may not be additional space beyond a small amount of expansion.

    On a related note, there's plans for another storage facility just south of the Henday when the LRT gets down there.

  50. #7550
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,771

    Default

    Would be nice if somebody here more mobile then me could get some current photos of Gary Wright maintenance facility.

    Just asking
    Mom said I should not talk to cretins!

  51. #7551

    Default

    Quote Originally Posted by Payment Certificate View Post
    Quote Originally Posted by Replacement View Post
    How are they not going to have ice dam problems on the tracks in winter time with the way they are pouring the concrete right up to the rails at same elevation? Plus in Millwoods I'm seeing areas where hills could easily lead to pooling areas. Much like roads experience when the road surface is not appreciably elevated.

    Are we doing a surface rail build out with no thoughts to this being a winter climate or one that is predisposed to really bad storms and intense rains?
    Track snow clearing equipment, drainage installed in median slabs and LRV mass should take care of it
    In our snow freeze thaw conditions what prevents any drainage getting clogged like most drainage does in the winter? Additionally how much can be quickly drained. Some of the line experiences dips and elevation changes. Pooling and ice build up could occur one would think.
    "if god exists and he allowed that to happen, then its better that he doesn't exist"

  52. #7552

  53. #7553

    Default

    Looks like the rain didnt slow them down this is good now if we can only see the bridge over the river taking shape that would be great

  54. #7554
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,399

    Default

    I took a look at 95 Avenue, and it looks like some parts of it have been leveled in preparation for paving (e.g., 91-92 Street)
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  55. #7555

  56. #7556
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    32,192

    Default







    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  57. #7557
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,399

    Default

    The North Saskatchewan LRT bridge is coming along. I imagine that we'll see the bridge being built in the fall.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  58. #7558
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    11,395

    Default

    Glad to see this intersection complete, so I guess the next intersection they will move to is 97 street? The other two intersections that need to get work have little to no traffic on them so those should hopefully get done afterwards but hopefully too, just as quickly. I wonder though when they will work on the avenue between the completed intersections.
    LRT is our future, time to push forward.

  59. #7559
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,488

    Default

    Indeed, 97 is up next. We are being told that they are aiming to have nearly everything but the stations done by end of year in the Downtown.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  60. #7560

    Default

    They are doing a lot of sub surface ground prep by the Winspear. there is some geotec cloth down today so it looks like a they are about to bring in the gravel for the train lines. all the conduit is installed and the sidewalks have been removed. this section may be done sooner as well. be interesting to see how the monthly parking is affected for the Fed building north entrance.

  61. #7561
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    32,192

    Default





    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

Page 76 of 76 FirstFirst ... 26667273747576

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •