  1. #7401
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,344

    Default

    I think 100 Street and 102 Avenue.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  2. #7402
    C2E SME
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    11,221

    Default

    Yes, notices have already been sent out.

  3. #7403
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,334

    Default

    Working their way east.

    97st will be interesting.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  4. #7404
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    11,361

    Default

    Well if they are going to be as quick with the other intersections as it seems they are being with this one it should go ok. One more year and a ton of construction sites will disappear which will improve the feel of downtown.
    LRT is our future, time to push forward.

  5. #7405
    I'd rather C2E than work!
    Join Date
    Nov 2006
    Location
    Edmonton, Canada
    Posts
    5,946

    Default

    ^ Except, that's when they'll start tearing up 102 west to 107 street.
    ... gobsmacked

  6. #7406
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,344

    Default

    At least the westbound leg will only have one busy intersection at 102 Avenue/105 Street.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  7. #7407
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,344

    Default

    I wonder if 102 Avenue (between 100 and 101 Street) will be done by fall.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  8. #7408
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    32,081

    Default

    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  9. #7409

    Default

    Interesting view of the 3 buildings, which I assume will never be seen again once something replaces the old BoM building. Until that's replaced.
    I am in no way entitled to your opinion...

  10. #7410
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,334
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  11. #7411
    I'd rather C2E than work!
    Join Date
    Oct 2007
    Location
    Edmonton
    Posts
    6,892

    Default

    Wow. Great pic!

  12. #7412
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,725

    Default

    I thought 102nd Ave was going to be shut down until the end of May.
    Mom said I should not talk to cretins!

  13. #7413
    C2E SME
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    11,221

    Default

    102 avenue has been closed for a year or longer and will continue to be for the foreseeable future.

  14. #7414

    Default

    Walked by the 101 and 102 site today. There is a good chance the road will be paved this week. (I did see paving stone though) Final concrete forms are going in tonight.

  15. #7415
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,725

    Default

    Quote Originally Posted by Marcel Petrin View Post
    102 avenue has been closed for a year or longer and will continue to be for the foreseeable future.
    Thanks. Its extensive work and when I heard that, I thought..can't be right.
    Mom said I should not talk to cretins!

  16. #7416
    I'd rather C2E than work!
    Join Date
    Mar 2006
    Location
    Strathearn, Edmonton
    Posts
    4,624

    Default

    If you'd like to understand what 102ave will look like when complete some of the only detailed design provided to Transed as part of the agreement is for this section and can be viewed at: https://www.edmonton.ca/documents/Ro...peDrawings.pdf

  17. #7417
    First One is Always Free
    Join Date
    Sep 2014
    Location
    Old Strathcona
    Posts
    23

    Default



    Last edited by karlwas; 29-05-2019 at 02:45 PM.

  18. #7418
    C2E Continued Contributor
    Join Date
    May 2007
    Location
    Royal Gardens
    Posts
    1,715

    Default

    Nice pics. What a difference in a couple of months once they have the tracks in and rebuild the road. So much dust right now.
    My antidepressent drug of choice is running. Cheaper with less side effects!

  19. #7419
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    32,081

    Default

    Updates to the Cloverdale/Muttart segment. Many apologies if I've broken any width violations.





    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  20. #7420

    Default

    Thanks for posting photo updates SDM! Don't worry about how wide an image is, the last image you posted isn't very wide compared to other images posted on the forum.
    Edmonton first, everything else second.

  21. #7421

  22. #7422
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    11,361

    Default

    That intersection was definitely done quite fast. I wonder if they will be pouring any of the track bed heading towards churchill sometime soon ir will they be focusing on the downtown intersections first?

  23. #7423
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    32,081

    Default

    101 St should be re-opening this coming Friday unless other circumstances arise.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  24. #7424

    Default

    the weather has certainly helped

  25. #7425
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,334

    Default

    Quote Originally Posted by B.ike View Post


    Really impressed with what I see here.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  26. #7426
    I'd rather C2E than work!
    Join Date
    Mar 2006
    Location
    Strathearn, Edmonton
    Posts
    4,624

    Default

    I am hopeful about the amount of soft scaping that shows up in the drawings. Travelling around lately, it's something Edmonton really seems to struggle with. I get it, the climate is not the most conducive, but a little green goes a long way.

  27. #7427
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,334

    Default

    The Valley Line has a TON of plantings...
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  28. #7428
    I'd rather C2E than work!
    Join Date
    Nov 2006
    Location
    Edmonton, Canada
    Posts
    5,946

    Default

    Haven't seen them yet this summer, but the 102 Ave cycle tracks had some outstanding flower pots last year.
    ... gobsmacked

  29. #7429
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,334

    Default

    ^coming soon...
    -----

    Even better in person!








    https://twitter.com/IanOyeg/status/1135632183178043392
    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  30. #7430
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    32,081

    Default

    June 10 is supposed to be the closure of 100 St/102 Ave intersection for 6 weeks, so they damn well better finish up soon.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  31. #7431
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,344

    Default

    At least 101 Street/102 Avenue is on schedule. It might be a tall order, but I hope the city can finish up 100 Street in time for K-Days.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  32. #7432
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,344

    Default

    Looks like the top part of Connors Road is close to paving.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  33. #7433
    I'd rather C2E than work!
    Join Date
    Nov 2006
    Location
    Edmonton, Canada
    Posts
    5,946

    Default

    ^^ K-Days? Parade maybe? Not sure what 100 St. has to do with K-Daze.

    Back on topic - hoping to see more progress on the NSR bridge - haven't really seen much progress.
    ... gobsmacked

  34. #7434
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    11,361

    Default

    Wow, that must be soooo fun and not at all monotonous laying all those bricks, lol.
    LRT is our future, time to push forward.

  35. #7435

    Default

    I believe 101 St is now open, or should be this week.
    www.decl.org

  36. #7436
    C2E Continued Contributor
    Join Date
    May 2007
    Location
    Royal Gardens
    Posts
    1,715

    Default

    Yup 101 St is completely open. Looks very nice and drives nice too
    My antidepressent drug of choice is running. Cheaper with less side effects!

  37. #7437
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,344

    Default

    If anybody is around with a camera, there are more bridge spans over 75 Street at Davies Station.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  38. #7438
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,344
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  39. #7439
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,334

    Default

    Further behind than last report...
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  40. #7440

    Default

    But P3's are perfection! They're so good that Harper tied infrastructure dollars to the projects being P3s! fake news! Sad! </snark>

  41. #7441
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    7,931

    Default

    The hurryer I go the behinder I get

  42. #7442

    Default

    Quote Originally Posted by IanO View Post
    Further behind than last report...
    A somewhat disturbing trend.

    2019 Q1 - 70%
    2018 Q4 - 73%
    2018 Q3 - 77%
    2018 Q2 - 80%
    2018 Q1 - 84%

    https://www.edmonton.ca/projects_pla...southeast.aspx

  43. #7443
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    11,361

    Default

    Unfortunately I feel they are still continuing their practice of deploying and working on part of the project and then when partially done they move on to another section without actually completing the site they were initially working on. I think they are rushing to get things done but losing more time in how they are rushing.
    LRT is our future, time to push forward.

  44. #7444
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,334
    Last edited by IanO; 10-06-2019 at 09:48 AM.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  45. #7445

  46. #7446
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,334

    Default

    Now that's a keeper. What an interesting/cool shot.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  47. #7447
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,344

    Default

    It would be nice if the city could put up signs around Kingsway, Connors Road and other locations to detour away from 101 Street. It’s a zoo at 5:00 pm
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  48. #7448
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,334
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  49. #7449
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton, Alberta
    Posts
    4,758

    Default

    Looks as though Bombardier could be on schedule. Kind of ironic don’t you think?
    BombardierRail (@BombardierRail)
    2019-06-12, 08:31
    Ten brand new LRVs built by our proud and talented employees in ⁦‪@cityofkingston‬⁩ for ⁦‪@yegvalleyLRT‬⁩. We are honoured to be part of their mobility solution and we look forward to seeing them circulating in the streets of ⁦‪@CityofEdmonton‬⁩ #TogetherWeMove#Bombardier #Rail #Edmonton pic.twitter.com/1ZMtb3lpgo
    “Canada is the only country in the world that knows how to live without an identity,”-Marshall McLuhan

  50. #7450
    I'd rather C2E than work!
    Join Date
    Oct 2007
    Location
    Edmonton
    Posts
    6,892

    Default

    Good lookin' trains. Can't wait to see them downtown and in the valley.

  51. #7451

    Default

    If we're 30% behind schedule & ~3 years into it, does that mean we're a year behind schedule at this point?
    Giving less of a damn than ever… Can't laugh at the ignorant if you ignore them!

  52. #7452

    Default

    Quote Originally Posted by IanO View Post
    No wonder they're running behind. They think that 95 ave runs north-south.

    Looking south along 95 Avenue

  53. #7453
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,334

    Default

    Quote Originally Posted by noodle View Post
    If we're 30% behind schedule & ~3 years into it, does that mean we're a year behind schedule at this point?
    Give or take...but they are working on a few strategies to get that back to maybe a 1/4-1/2.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  54. #7454

    Default

    I can hardly wait to hear how much that's gonna cost us.
    Giving less of a damn than ever… Can't laugh at the ignorant if you ignore them!

  55. #7455
    I'd rather C2E than work!
    Join Date
    Nov 2006
    Location
    Edmonton, Canada
    Posts
    5,946

    Default

    ^^ Yes, strategies.

    You mean like the one putting small businesses out of business?
    ... gobsmacked

  56. #7456
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    7,931

    Default

    I wonder if someday we could build the cars here in Alberta and have an Alberta company doing the entire projects. Same goes for a lot of other imports.

  57. #7457
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,725

    Default

    So Valley will be in operation what 2024?
    Mom said I should not talk to cretins!

  58. #7458
    C2E Posting Power
    Join Date
    Jun 2009
    Location
    Beaumont, ab
    Posts
    968

    Default

    Quote Originally Posted by envaneo View Post
    So Valley will be in operation what 2024?
    Which leg are you asking about? The SE or the W leg of the Valley line?

  59. #7459
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    11,344

    Default

    Probably Spring 2021.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  60. #7460
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,725

    Default

    Quote Originally Posted by maclac View Post
    Quote Originally Posted by envaneo View Post
    So Valley will be in operation what 2024?
    Which leg are you asking about? The SE or the W leg of the Valley line?
    The one currently under construction
    Mom said I should not talk to cretins!

  61. #7461
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,725

    Default

    Quote Originally Posted by The_Cat View Post
    Probably Spring 2021.
    Thanks. 2024 was once the line is tested and hand over etc.
    Mom said I should not talk to cretins!

  62. #7462
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    32,081

    Default



    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  63. #7463
    Becoming a C2E Power Poster
    Join Date
    May 2012
    Location
    Virginia Park
    Posts
    156

    Default

    Why have they left this sign up? It has to be nearing 15 years old now. Per Google, it's been there since before early 2007.

    Twenty one, thirty one, and seven twenty-seven.

  64. #7464

    Default

    They did not say when they're coming so the sign is still correct.
    Advocating a better Edmonton through effective, efficient and economical transit.

  65. #7465
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    11,361

    Default

    ^lol. Sad but very true.

  66. #7466
    C2E Continued Contributor
    Join Date
    Jul 2015
    Location
    Downtown Edmonton
    Posts
    1,851

    Default

    Quote Originally Posted by nickv View Post
    That's what she said.
    There was no need to change that plaque. We are the City of Champions.

Page 75 of 75 FirstFirst ... 25657172737475

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •