    Hmmm, okay thanks. It came up on realtor.ca today for some reason, that's why I was curious. I really like this project and hope it goes ahead.
    "The difference between genius and stupidity is that genius has its limits" - Einstein

  2. #1002
    Addicted to C2E
    Mr. Reality Check

    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    12,173

    Default

    Quote Originally Posted by GizmoForMayor View Post
    Hmmm, okay thanks. It came up on realtor.ca today for some reason, that's why I was curious. I really like this project and hope it goes ahead.
    we really liked it as well (although our end plans were quite different). we couldn’t quite make it work in the time frame ChrisD and company managed to but still wish them luck with it.
    "If you did not want much, there was plenty." Harper Lee

  3. #1003

    Default

    ^ Oh I didn't know you guys had your eyes on this property as well. Would you have incorporated the old structure as well? (not sure if that is mandated in the sale)
    "The difference between genius and stupidity is that genius has its limits" - Einstein

  4. #1004
    Addicted to C2E
    Mr. Reality Check

    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    12,173

    Default

    Quote Originally Posted by GizmoForMayor View Post
    ^ Oh I didn't know you guys had your eyes on this property as well. Would you have incorporated the old structure as well? (not sure if that is mandated in the sale)
    incorporating the old structure was both the challenge and the allure and was a requirement.

    not always being successful is the nature of the beast i'm afraid - if you can put something together on one out of ten potential projects, that's a good ratio and about three times what some say you need to look at. we've made offers on the stovell block as well as a number of other potential projects that didn't come to fruition for one reason or another. some you say "that's life" and move on and others you regret for the rest of your career even though you still have no choice but to move on.

    some of my favourite projects to this day never got past the conceptual/proposal phase, some publicly (i.e. the national portrait gallery) and some that will remain forever undisclosed except to those of us that worked on them.
    "If you did not want much, there was plenty." Harper Lee

  5. #1005

    Default

    It would have been interesting to see what you could have done with the Stovell Block.



    And an older one.


  6. #1006
    Becoming a C2E Power Poster
    Join Date
    Sep 2014
    Location
    Spruce Grove
    Posts
    308

    Default

    97th needs a lot of $$$$ invested.

  7. #1007
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    31,742
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  8. #1008
    I'd rather C2E than work!
    Join Date
    Feb 2006
    Location
    Edmonton, AB
    Posts
    7,671

    Default

    This project is still a go. The sale closes the end of March. Lots of interest on this one and we are planning on breaking ground this spring.

  9. #1009
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    31,742

    Default

    Quote Originally Posted by ChrisD View Post
    This project is still a go. The sale closes the end of March. Lots of interest on this one and we are planning on breaking ground this spring.
    Uhm...which project?
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  10. #1010
    C2E Hard Core Contributor
    Join Date
    Apr 2010
    Location
    Westmount
    Posts
    3,374

    Default

    ^Pretty sure he's referring to Substation 600, as he was asked for an update in post 999.
    “Son, one day this will be an iconic structure shaping Edmonton’s skyline.”

  11. #1011
    I'd rather C2E than work!
    Join Date
    Feb 2006
    Location
    Edmonton, AB
    Posts
    7,671

    Default

    Quote Originally Posted by Sonic Death Monkey View Post
    Quote Originally Posted by ChrisD View Post
    This project is still a go. The sale closes the end of March. Lots of interest on this one and we are planning on breaking ground this spring.
    Uhm...which project?
    Ha, well both - Substation and 124 Westmount.

  12. #1012

    Default

    Thanks for the update, Chris! Very glad to hear that.
    "The difference between genius and stupidity is that genius has its limits" - Einstein

Page 11 of 11 FirstFirst ... 7891011

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •