Page 25 of 25 FirstFirst ... 152122232425
Results 2,401 to 2,406 of 2406

Thread: Encore | Residential Tower | Under Construction| 43 floors - 138m

  1. #2401
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,009

    Default

    The requirements are hard surfaced, lit, landscaped, drained...
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  2. #2402

    Default

    Unless you're Katz. Then you can get away with tossing a small percentage of the profit to the community.

  3. #2403
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,009

    Default

    54.6 Hardsurfacing and Curbing of Parking and Loading Spaces
    General Requirements

    Bylaw 17973

    April 27, 2017

    Required parking and loading facilities shall provide for, and include, an adequate, safe and convenient arrangement of vehicular points of ingress or egress, driveways, internal roadways, aisles and ramps, loading of motor vehicles all in relation to buildings and entry points to buildings on the Site. Such facilities shall comply with the following design, development and maintenance standards:

    Bylaw 16312

    January 21, 2013

    Bylaw 17973

    April 27, 2017

    all required parking and loading facilities shall be clearly demarcated, have adequate storm water drainage and storage facilities, and be Hardsurfaced;

    Notwithstanding Section 54.6(1)(a)(i), parking and loading facilities, and the access thereto, are not required to be Hardsurfaced until the roadway or Lane from which access is provided is Hardsurfaced; and

    in situations where lighting of off-street parking and loading facilities is to be provided, the lighting shall be arranged, installed and maintained to deflect, shade and focus light away from any adjacent land Uses.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  4. #2404
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,009
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  5. #2405
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,009
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  6. #2406
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    48,009
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

Page 25 of 25 FirstFirst ... 152122232425

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •