Thread: Edmonton Construction Projects, Proposals and Rumours 2

  1. #101
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,664

    Default

    Quote Originally Posted by Hilman View Post
    Cool infographic on some of the new towers going up/announced:



    http://theyardsyeg.ca/high-life
    The scale is wrong - Ultima s/b 1/2 of the Stantec Tower

  2. #102
    Becoming a C2E Power Poster
    Join Date
    May 2014
    Location
    Downtown Edmonton
    Posts
    341

    Default

    Encore also shouldn't be taller than Jasper House and should be half the height of Stantec. The John T. Ross residence also looks a lot bigger than it actually is. Oh well, still a cool graphic.
    Hater of Stucco and Exposed Concrete Exteriors

  3. #103

    Default

    I guess this is moving ahead again.

    Crews are back on the CWB site at 113st and Jasper.

  4. #104
    C2E Stole my Heart!!!!
    Join Date
    Jun 2007
    Location
    Ozerna, North Edmonton
    Posts
    8,961

    Default

    Simon O'Byrne said there should be 31 cranes in the downtown core by this summer during his speech at the casino announcement.

  5. #105

    Default

    Quote Originally Posted by Brutalism Sucks View Post
    Encore also shouldn't be taller than Jasper House and should be half the height of Stantec. The John T. Ross residence also looks a lot bigger than it actually is. Oh well, still a cool graphic.
    Encore, if built, will be higher than 110 m as it suppose to be around 40 floors, so it should be taller than Jaser House- atleast the same height.

  6. #106

    Default

    Quote Originally Posted by Hilman View Post
    Quote Originally Posted by Brutalism Sucks View Post
    ^That's pretty cool. Are those prices accurate? $20 Mil for Fox I?
    According to the Alberta government website (who knows how accurate it is), its shows the Fox Towers (plural) at $42 million.

    http://majorprojects.alberta.ca/details/Fox-Towers

    For comparison, they have the Ultima at $65 million, I knew stucco was cheap but damn that's a nice cost savings
    2007 prices is a lot different than 2013/14. Inflation when through the roof since that time for construction.

  7. #107

    Default

    Arcus, 105 Ave & 109 St, NW, T5H

    $30,000,000 est

    Note: Project is waiting for the owner's decision to proceed and has been put on indefinite hold.

    Project: construction of two apartment buildings with commercial at base.

    Scope: 13 storeys; 2 structures; 320 units

    First report Mon Jun 11, 2007. Last report Tue Feb 25, 2014.
    This report Thu May 07, 2015.

    http://www.cmdbr.com/cgi-bin/top10.p...region=western

  8. #108
    C2E Continued Contributor
    Join Date
    May 2010
    Location
    St. Albert, Alberta
    Posts
    1,007

    Default

    Quote Originally Posted by EdmTrekker View Post
    Quote Originally Posted by Hilman View Post
    Cool infographic on some of the new towers going up/announced:



    http://theyardsyeg.ca/high-life
    The scale is wrong - Ultima s/b 1/2 of the Stantec Tower
    the Delta is missing....
    Thank You For Finally Going Higher!

  9. #109
    First One is Always Free
    Join Date
    Oct 2014
    Posts
    27

    Default

    Does anyone have details/renderings for the reclad of Scotia Place? There was someone on CBC's Edmonton AM this morning who mentioned the reclad as a side note to a larger discussion on the projected future office vacancy rates. First I've heard of it.

  10. #110
    Plug C2E into my veins!!!
    Join Date
    Apr 2007
    Location
    Edmonton, Alberta, Westwood
    Posts
    16,285

    Default

    Quote Originally Posted by BDD View Post
    Does anyone have details/renderings for the reclad of Scotia Place? There was someone on CBC's Edmonton AM this morning who mentioned the reclad as a side note to a larger discussion on the projected future office vacancy rates. First I've heard of it.
    First I have heard but I am intrigued. Reclad? There are many Uglier suspects out there, so maybe there is more to it?

  11. #111

    Default

    I had heard that already, maybe it was on c2e.

    The indication from the radio interview was that it would lose its gold colour and be replaced with "clear" glass, which I assume means it will appear silver/grey like HSBC Bank Place. I bemoan the loss of colour.

  12. #112
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,791

    Default

    Me too

  13. #113
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,543

    Default

    Reclad yes, blue or grey, already been to EDC.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  14. #114
    Plug C2E into my veins!!!
    Join Date
    Apr 2007
    Location
    Edmonton, Alberta, Westwood
    Posts
    16,285

    Default

    hmmmm. Neither colour excites me.

  15. #115

    Default

    I Like that gold colour; couldn't they just find a modern version of that?

  16. #116

    Default

    Quote Originally Posted by ctzn-Ed View Post
    I Like that gold colour; couldn't they just find a modern version of that?
    I think I read on here that they don't make the gold color panels or if they do they are very expensive. I could be wrong but I remember reading something like that.

  17. #117
    C2E SME
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    10,557

    Default

    So, after the musical chairs game with Stantec, Enbridge and the CoE was done with most people figured that we'd be done with any further office towers for quite some time, as there were no major tenants left to move around. However it sounds like there's one more big RFP left. It'll be interesting to see where they end up.

  18. #118

    Default

    I hope it Katz trophy tower! I would throw my support behind his vision and developments

  19. #119

    Default

    Quote Originally Posted by Marcel Petrin View Post
    So, after the musical chairs game with Stantec, Enbridge and the CoE was done with most people figured that we'd be done with any further office towers for quite some time, as there were no major tenants left to move around. However it sounds like there's one more big RFP left. It'll be interesting to see where they end up.
    Marcel, that's a very interesting little tidbit. Can you provide information with respect to the specific tenant? Because when I look at the Edmonton market, the only tenant's I see that fit the "big RFP" criteria (i.e. someone who can act as a lead tenant in a new tower) is as follows:

    Epcor/Capital Power: Anchoring brand new Stationlands Tower 1 (Epcor Tower)
    City of Edmonton: Anchoring brand new City of Edmonton Tower
    Stantec: Anchoring brand new Stantec Tower
    Enbridge: Anchoring brand new Kelly-Ramsey Block Tower
    ATB: Anchoring Tower 2 of Telus Tower Complex (ATB Tower)
    GoA: Anchored in bldgs across the province including heavy concentrations around capital blvd. Can't reasonably expect consolidation
    Atco: Anchored in Atco tower (and very decentralized across Alberta so I wouldn't even consider them a large RFP in the downtown)

    Then there is a plethora of smaller firms, service companies, EPCM's, etc. that are either small players or based in the suburbs because of the natural fit with their clients.

  20. #120
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,995

    Default

    Only thing I can think of, maybe the GOA will finally pull out of the Terrace building.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  21. #121
    C2E SME
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    10,557

    Default

    Quote Originally Posted by millwoods View Post
    Marcel, that's a very interesting little tidbit. Can you provide information with respect to the specific tenant? Because when I look at the Edmonton market, the only tenant's I see that fit the "big RFP" criteria (i.e. someone who can act as a lead tenant in a new tower) is as follows:
    It's under confidentiality agreements at this point. Not anything that I or my business has signed or been involved with, but other people I've talked with mentioned it without attaching a name. I've got a pretty good idea who it is, but I'm not going to play 20 questions about it. It's not a government department/agency. It's also not 100% for sure going ahead, they might review all the proposals and decide to stay put or take up some space in some of the other new towers.

    From what I was told, we'll likely see a decision made in the next few months.

  22. #122

    Default

    If it is GOA, I see 102 centre going up.

  23. #123
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,995

    Default

    ^
    Quote Originally Posted by Marcel Petrin View Post
    It's not a government department/agency. It's also not 100% for sure going ahead, they might review all the proposals and decide to stay put or take up some space in some of the other new towers.

    From what I was told, we'll likely see a decision made in the next few months.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  24. #124
    C2E Hard Core Contributor
    Join Date
    Jan 2012
    Location
    Sherwood park
    Posts
    2,425

    Default

    Telus?

  25. #125
    Becoming a C2E Power Poster
    Join Date
    Nov 2009
    Posts
    390

    Default

    Swiss Chalet head office

  26. #126
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,791

    Default

    Where is Sonic Health building their offices? They were supposedly building a tower at one time.

  27. #127
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,664

    Default

    Quote Originally Posted by Drumbones View Post
    Where is Sonic Health building their offices? They were supposedly building a tower at one time.
    The more important question is will they have a contract at all. Iirc there were some disputes surrounding the RFP process - and now there is the matter of a new Government that may be less inclined to out source lab services. Early address of this by AHS and our impoverished Government would be a surprise imo.

  28. #128
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,791

    Default

    Sounds good by me. I wondered all along why we needed the Aussies taking a major bite from our health care system.

  29. #129

    Default

    148196691-006
    03-Jun-2015
    7019 - 104 STREET NW
    Plan 3900R Blk 39 Lots 5-9

    To construct a Professional, Financial, and Office Support Services/Health Services Use building (Professional, Financial, and Office Support Services "(SHELL SPACE ON MAIN FLOOR)", Health Services on 2nd floor).

    DAWSON WALLACE CONSTRUCTION LTD, (PETER)

    $2,170,000

  30. #130
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,995

    Default

    Highfield Place (106 St/100 Ave) reskinning

    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  31. #131

    Default

    Does anyone know about this project?

    Westmount mall by Thomas Huizinga, on Flickr

    Westmount mall by Thomas Huizinga, on Flickr
    Edmonton first, everything else second.

  32. #132
    C2E SME
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    10,557

    Default

    Last I saw of it a year or two ago, it was 5 stories. Interesting.

  33. #133
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,995

    Default

    The empty lot immediately north of Wild Earth on 99 St, where The Cone ice cream stand was located, is being dug up. Anyone know what's being built there?
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  34. #134

    Default

    Thought there was a thread for Gene Dub's skinny building but can't seem to find it.
    This is from today.

    Support the mob or mysteriously disappear...

  35. #135
    Administrator *
    Join Date
    Nov 2011
    Location
    Queen Mary Park, Edmonton
    Posts
    2,755

    Default

    Thread was renamed to its new name of "Five Oaks Building".

    http://www.connect2edmonton.ca/forum...t=18419&page=6

  36. #136

    Default

    I'll just plop this here since it shows Hendrix, MacEwan crane, Mayfair North, what I think is the Norquest crane, Ultima, Edmonton Tower, Kelly Ramsey, Walterdale, Hyatt hotel and Edgewater.


  37. #137

    Default

    are there any threads on the Station Lands development? I did a quick search and the only thing that came up was Epcor Tower (Station Lands Phase 1)

  38. #138

  39. #139
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,791

    Default

    Quote Originally Posted by bulliver View Post
    Thought there was a thread for Gene Dub's skinny building but can't seem to find it.
    This is from today.

    It kind of looks like a third world project.

  40. #140

    Default

    Thanks, I didn't go that far back!

  41. #141

    Default

    Quote Originally Posted by ThomasH View Post
    Does anyone know about this project?
    Westmount mall by Thomas Huizinga, on Flickr
    ^it's weird that i like this. it's kinda plain and reminds me a bit of the Holiday Inn Express on 104th street and 100th avenue.

  42. #142
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    10,895

    Default

    Where is that supposed to be?
    LRT is our future, time to push forward.

  43. #143
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,664

    Default

    "it's weird that i like this. it's kinda plain and reminds me a bit of the Holiday Inn Express on 104th street and 100th avenue."

    i agree it does.

  44. #144
    You registered but never posted. username to be deleted.
    Join Date
    Dec 2012
    Posts
    800

    Default

    Was Fox 1 really only 20 million??

  45. #145

    Default

    I can't seem to find a page for the Funicular... so I shall post this here

    http://www.cbc.ca/news/canada/edmont...ular-1.3479504

  46. #146
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,995
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  47. #147

    Default

    An acquaintance of mine recently mentioned they heard there will be construction starting near Wild Earth on 99 Street and 89 Avenue, does anyone know more about the project? Earlier this week I noticed a trailer and some equipment dropped off on the site immediately to the north.

  48. #148
    Plug C2E into my veins!!!
    Join Date
    Apr 2007
    Location
    Edmonton, Alberta, Westwood
    Posts
    16,285

    Default

    The old 7/11 empty lot? That would make me very happy.

  49. #149
    C2E Continued Contributor
    Join Date
    Sep 2013
    Location
    I don't even know anymore :/
    Posts
    1,112

    Default

    Quote Originally Posted by WhyteAveCam View Post
    An acquaintance of mine recently mentioned they heard there will be construction starting near Wild Earth on 99 Street and 89 Avenue, does anyone know more about the project? Earlier this week I noticed a trailer and some equipment dropped off on the site immediately to the north.
    I saw the trailer and stuff today, figured it was staging for road construction or something, but that would be awesome to hear!

  50. #150

    Default

    Quote Originally Posted by seamusmcduffs View Post
    Quote Originally Posted by WhyteAveCam View Post
    An acquaintance of mine recently mentioned they heard there will be construction starting near Wild Earth on 99 Street and 89 Avenue, does anyone know more about the project? Earlier this week I noticed a trailer and some equipment dropped off on the site immediately to the north.
    I saw the trailer and stuff today, figured it was staging for road construction or something, but that would be awesome to hear!
    Turned out just to be prep work for the ice cream stand, but in talking with another acquaintance in the development sector procura is working out details for a 30+ story highrise residential tower there.

  51. #151
    C2E Continued Contributor
    Join Date
    Sep 2013
    Location
    I don't even know anymore :/
    Posts
    1,112

    Default

    That stupid Ice Cream stand is an eyesore, but I guess its better than a completely empty lot.

  52. #152
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,995

    Default

    C'mon man, really? The Cone is not an eyesore - it's cute and kitschy. It attracts lots of people, especially families. The ice cream is very good, and the service is great. If you really hate it that much then take heart in that it's only there for the summer.

    Believe me, there's a lot worse eyesores to rage at.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  53. #153
    C2E Continued Contributor
    Join Date
    Sep 2013
    Location
    I don't even know anymore :/
    Posts
    1,112

    Default

    OK eyesore is an exaggeration. Let's just say the lot isn't living up to its full potential right now.

  54. #154
    Administrator *
    Join Date
    Nov 2011
    Location
    Queen Mary Park, Edmonton
    Posts
    2,755

    Default

    Can't seem to find a thread for 7019 104 Street. It's a smaller infill project that's pretty much complete. It turned out really well, especially for its location!


    7019 104 Street by Chris Vazquez, on Flickr


    7019 104 Street by Chris Vazquez, on Flickr


    7019 104 Street by Chris Vazquez, on Flickr

  55. #155
    C2E Stole my Heart!!!!
    Join Date
    Jun 2007
    Location
    Ozerna, North Edmonton
    Posts
    8,961

    Default

    Looks really good, thanks for the shots.

  56. #156
    C2E Continued Contributor
    Join Date
    Sep 2013
    Location
    I don't even know anymore :/
    Posts
    1,112

    Default

    ^Saw that. Hopefully more than a duplex or something. That would be the perfect spot to start the urbanization of 109th

  57. #157
    C2E Hard Core Contributor
    Join Date
    Sep 2008
    Location
    Iqaluit, Nunavut
    Posts
    2,135

    Default

    Quote Originally Posted by chrisvazquez7 View Post
    Can't seem to find a thread for 7019 104 Street. It's a smaller infill project that's pretty much complete. It turned out really well, especially for its location!


    7019 104 Street by Chris Vazquez, on Flickr
    Strathcona Junction ARP and EDC at work. (Plus good work by the Architect, who I'm forgetting at the moment)

  58. #158
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,995

    Default

    Cambridge Daycare building on Whyte Ave west of 108 St is being renovated.
    p.s. I really must check out that DVD shop sometime soon.

    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  59. #159
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,791

    Default

    Still hoping for someone to build an observation/communications tower. Rogers? Maybe they could build it in the used hubcap district. lol

  60. #160
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    10,850
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  61. #161
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,995

    Default

    qu'est ce que c'est?

    https://twitter.com/Beljandevt/statu...19701185724416

    Beljan Development @Beljandevt
    Discussing, debating and bouncing ideas off of each other on 'branding' a new project - Oliver Exchange. @OCLYEG #yeg #adaptive_reuse

    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  62. #162

    Default

    Mixed=use and street-orientated residential buildings in the middle of 70's suburbia?

    Tweedle Place neighbourhood rezoning for "a mixed used development with a maximum of 320 residential units, in a complex consisting of two 12-storey residential apartment buildings with small-format local commercial development on the ground level."

    City of Edmonton info. https://www.edmonton.ca/city_governm...eplacerezoning
    Detailed info and drawings: https://www.edmonton.ca/city_governm...ptDrawings.pdf
    Live and love... your neighbourhood.

  63. #163
    Live and love... your neighbourhood.

  64. #164
    C2E Continued Contributor
    Join Date
    Sep 2013
    Location
    I don't even know anymore :/
    Posts
    1,112

    Default

    I feel like the community will not be happy with this.

  65. #165
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,664

    Default

    Might be an interesting read: $200,000 an Acre

    "Picking up from where his last book left off, Doug Kelly has published a second collection of stories about Albertans in the development industry. Kelly’s first book, $100,000 an Acre, covered events in the 1950s, 60s, 70s and 80s. Much has changed since then, starting with land prices. His second book, aptly named $200,000 an Acre, examines the contemporary development landscape and new trends in an industry that had to respond to a booming population. The book relies heavily on quotations gathered during 134 interviews and profiles people in a range of development industry jobs. Subjects include builders, planners, engineers, contractors, marketers, public servants and the developing companies themselves."

    http://www.dougkelly.ca/product/200000-an-acre/

    https://www.youtube.com/watch?v=WbgIYEcQzQ8

    http://www.edmontonexaminer.com/2017...neighbourhoods

  66. #166

    Default

    Mystery project


    Edmonton in the beginning of 2018. by Thomas Huizinga, on Flickr
    Edmonton first, everything else second.

  67. #167
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,995

    Default

    ^ Isn't that the Arlington site?
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  68. #168
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,543

    Default

    It is.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  69. #169
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    10,895

    Default

    So is there possibility of a project slated for the Arlington site or just ThomasH hoping for something? Just wondering.
    LRT is our future, time to push forward.

  70. #170
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,543

    Default

    I guess we will have to wait and see...
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  71. #171
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,791

    Default

    A giant billboard?

  72. #172

    Default

    not holding my breathe on this one.

  73. #173

    Default

    I thought he was being sarcastic. "Mystery" as in "unsolved." Is there something coming for the lot?

  74. #174
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    10,895

    Default

    I think I know what's coming for the lot. Within the next month we will see more snow on that lot.
    LRT is our future, time to push forward.

  75. #175
    Becoming a C2E Power Poster
    Join Date
    Sep 2012
    Location
    Downtown Edmonton
    Posts
    398

    Default

    Quote Originally Posted by Edmcowboy11 View Post
    I think I know what's coming for the lot. Within the next month we will see more snow on that lot.
    ^That whole 106 Street block from Jasper to 100 Avenue is very sad to walk.

  76. #176
    Becoming a C2E Power Poster
    Join Date
    Sep 2012
    Location
    Downtown Edmonton
    Posts
    398

    Default

    From: https://www.albertahealthservices.ca...submission.pdf

    Divestiture: Edmonton Zone
    1. Edmonton Recruitment House property

    2.Manville Nurses Residence
    Where are these?

    2.1 Priority Project Descriptions
    2.1.1 Glenrose Rehabilitation Hospital Energy Centre
    Project Description / Scope of Work: Upgrade of the Glenrose Rehabilitation Hospital Energy Centre to meet the increased demand of the expanded and redeveloped RAH/Glenrose/Norwood Campus. The scope of work will include expansion of the Energy Centre to about 4,000 square metres(from 1,942 square metres), additional and upgraded equipment and changes or enhancements to delivery piping, conduits and tunnels.

    Rationale for Project:The Energy Centre was built in 1986 with an upgrade and expansion in 2009. The uninterrupted power supply (UPS) is well beyond its 20 years of service life and the boiler equipment has also reached its load capacity for steam generation and delivery. There is no physical room for expansion and much of the equipment is beyond its useful life. Redevelopment of Royal Alexandra Hospital, Glenrose Rehabilitation Hospital, and Capital Care Norwood are dependent on an upgraded and expanded Energy Centre.

    Capital Project Cost Estimate: Preliminary estimates for the proposed Energy Centre redevelopment based on the Master Plan are in the range of $65 million to $75 million. The project value is subject to confirmation/refinement upon completion of the Business Case.

    Operating Expenditure Impact:To be confirmed.
    Current Status of Project:Final scope confirmation pending completion of the ongoing Business Case.


    And for the Downtown/Oliver crowd:

    2.2 Parking Structures
    Edmonton General Hospital
    Number of stalls: 650
    Estimated Cost: $25 million
    The Edmonton General Hospital is nearing the end of its life and requires replacement. AHS Executive Committee approved funding from the Parking Services Internal Reserve and design is underway. It is anticipated construction will begin in the spring of 2018. AHS has not approved construction or funding


    Appendix A: Potential Future Major Capital Projects
    Covenant Health Edmonton General Hospital Infrastructure Stabilization and Renewal

  77. #177
    Becoming a C2E Power Poster
    Join Date
    Sep 2012
    Location
    Downtown Edmonton
    Posts
    398

    Default

    Lots of Health Projects for Edmonton in the future:

    Edmonton North East Community Health Centre
    Royal Alexandra Hospital-Clinical Services Building
    Royal Alexandra Hospital-Phase 1B (new tower and required building demolition)
    Stollery Children’s Hospital-New Tower Development (as per Master Plan)
    Royal Alexandra Hospital-Final Phase
    Stollery Children’s Hospital Cardiac Move and Beds
    Alberta Hospital Edmonton Specialty Care Program Expansion (Schrag Pavilion)
    Edmonton Colorectal Screening Centre
    Edmonton Addiction and Mental Health Urgent Care Centre
    Edmonton Stollery Children’s Hospital New Tower Development as per Master Plan
    Edmonton Zone Hospice Beds (Zone wide)
    Alberta Hospital Edmonton / Henwood Redevelopment
    Glenrose Rehabilitation Hospital Redevelopment (Accessibility Improvements, Nursing Units, Aquatic Therapy)
    Mazankowski Alberta Heart Institute (MAHI) Fit Out of Shelled Space as per Master Plan
    University of Alberta Hospital Transplant Redevelopment
    University of Alberta Hospital Medical Outpatient Unit Expansion
    Sturgeon NICU Development
    University of Alberta Hospital Emergency Department Second Floor Redevelopment
    University of Alberta Hospital 18 Bed Inpatient Unit
    University of Alberta Hospital Development Phase 1 (includes KEC Expansion and new Clinical Support Building
    University of Alberta Hospital Development Phase 2 (includes new Inpatient Tower and renovations to existing WMC)
    Adult Ambulatory Clinics relocate from the UAH to KEC as per Master Plan
    Alberta Hospital Edmonton Redevelopment
    Sturgeon Community Hospital –Endoscopy and Ambulatory Clinic Redevelopment (Phases 3 and 4 of current project) and Inpatient Bed Expansion

    Grey Nun’s Community Hospital -Develop a Community Health Centre
    Grey Nun’s Community Hospital -ED and Main Floor Expansion
    Misericordia Community Hospital -New Bed Tower (medical and surgical beds)
    Grey Nuns Vascular Surgery OR
    Misericordia Community Hospital and Villa Caritas Mental Health Consolidation (on main campus)
    Edmonton General Hospital Infrastructure Stabilization and Renewal
    Youville Home Redevelopment and Renewal
    Misericordia Community Hospital Redevelopment of Existing Treatment Centre

    Cross Cancer Institute Phase 1 Development (includes renovations to pharmacy and vaults)
    Cross Cancer Phase 2 (major renovation and expansion)

  78. #178

    Default

    Some of the pics are not proper. Love to see some more pics but cannot see a few of them and their prices really up.

  79. #179

    Default

    Oliver residential proposal:



    The site of the proposed building:

    Source: https://www.edmonton.ca/residential_...velopment.aspx
    Edmonton first, everything else second.

  80. #180
    Plug C2E into my veins!!!
    Join Date
    Apr 2007
    Location
    Edmonton, Alberta, Westwood
    Posts
    16,285

    Default

    ^That project also takes up the community garden plot does it not? Wasn’t the garden supposed to be moved somewhere else? I can’t recall what the proposal was when it first came up.

  81. #181
    Becoming a C2E Power Poster
    Join Date
    Oct 2013
    Location
    Oliver
    Posts
    287

    Default

    Got a notice in the mail maybe a month ago of a proposed land swap for part of the land on this site to increase park space beside the community garden for a plot on NE quarter of Oliver arena (which is currently parkland) along 104 ave.

  82. #182

    Default


    Source: https://edmonton.skyrisecities.com/f...re-m-3s.28681/

    This project is called "Manchester Square" even though the buildings imitate Dutch architecture. It is located on 107 Ave and 120 St. Such a terrible looking development.
    Edmonton first, everything else second.

  83. #183
    I'd rather C2E than work!
    Join Date
    Feb 2009
    Location
    Westmount, Edmonton
    Posts
    5,509

    Default

    I'll take it over the Brick.

    "For every complex problem there is an answer that is clear, simple, and wrong"

  84. #184

    Default

    That will beautify that area somewhat. It is a nice change.
    " The strength of a man is in the stride he walks."

  85. #185

    Default

    Disneyland!
    I am in no way entitled to your opinion...

  86. #186

    Default

    Yikes.
    Live and love... your neighbourhood.

  87. #187
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,791

    Default

    Got something against Dutch? Will they have call girls in the windows?

  88. #188

    Default

    This is basically a warehouse with fake building facades on the front.
    Edmonton first, everything else second.

  89. #189

    Default

    Apparently Disney has 2/3 scale upper floors on their main street USA, just like this.

    Nasty parking lot, horrible architecture.
    There can only be one.

  90. #190
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,664

    Default

    Quote Originally Posted by ThomasH View Post
    This is basically a warehouse with fake building facades on the front.
    And totally tacky. I can’t believe the developer wants to go ahead with this design and parking lot layout.

  91. #191
    C2E Hard Core Contributor
    Join Date
    Sep 2008
    Location
    Iqaluit, Nunavut
    Posts
    2,135

    Default

    No.

  92. #192
    I'd rather C2E than work!
    Join Date
    Feb 2009
    Location
    Westmount, Edmonton
    Posts
    5,509

    Default

    It's interesting comparing the comments here to the ones on the Westmount Neighbours FaceBook group. People there seem to quite like the look.

    "For every complex problem there is an answer that is clear, simple, and wrong"

  93. #193
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    10,850

    Default

    I’m sure this development will be a step up from Europa Boulevard.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  94. #194
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,664

    Default

    Quote Originally Posted by The_Cat View Post
    I’m sure this development will be a step up from Europa Boulevard.
    Simons is on Europa Boulevard along with some very nice stores. I doubt that this mall will be attracting much other a Subway and a dental office.
    Last edited by EdmTrekker; 28-06-2018 at 06:09 PM.

  95. #195
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,791

    Default

    Quote Originally Posted by Paul Turnbull View Post
    It's interesting comparing the comments here to the ones on the Westmount Neighbours FaceBook group. People there seem to quite like the look.
    People here in the forum are nowhere near the norm. When it comes to normal most are about as ab as you can get.
    Last edited by Drumbones; 28-06-2018 at 03:32 PM.

  96. #196
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    10,895

    Default

    I think the development will look interesting. Far far nicer than the big green warehouse that is currently on the site. I think the design gives it some character. I prefer seeing diversity in design throughout the city.

  97. #197
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,791

    Default

    I kinda like it myself

  98. #198

    Default

    Why can't the parking lots for these strip malls go in the back. This one especially, make a road with an arched tunnel beneath a building (euro castle style) and have all the cars go into the back.
    Design wise...if we're going to have a strip mall, let's make it fun. At first glance, this looks tacky, but I have a feeling it might turn out decent once executed.

  99. #199

    Default

    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    A panorama of Edmonton's skyline from the north side. The crane visible on the far right of the photo is where MacLaren Tower is being built. This gives you an idea of how large Edmonton's urban footprint is.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    Ice District tower B


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    MacEwan University SAMU under construction. This building expansion will take over what used to be green space between the existing building and the sidewalk, making the area feel more urban.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    The back side of MacEwan University


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    Alex Decateau Park


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    Encore Tower under construction. New LRT line also under consrtuction on the street.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    Encore Tower under construction.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    The bad side of Stantec Tower under construction, looking better.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    The new cladding on the Stanley Milner Library renovation in downtown appears to be brown. I am having an impossible time trying to like this building so far.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    Core samples and preparations are underway for construction of Emerald Tower.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    Building renovation across the street from Emerald Tower.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    Building renovation underway in the Brewery District, a power centre near downtown. Notice the awful blank wall of the back side of the power centre that faces a bike path.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    The former light industrial area beside the Brewery District has had all streets and sidewalks redone last summer. The area no longer feels like an industrial area.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    This building is under construction just across the street from the Brewery District.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    Building under construction, as mentioned above. Note that the square shaped building takes up almost an entire block.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    Looking south down 124th street you see MacLaren Tower under construction in the distance.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    Getting closer makes it easy to see that MacLaren will demand attention when complete.


    Edmonton July 6, 2018 by Thomas Huizinga, on Flickr
    There are still some vacant lots to fill up but looks a 1000 times better than it looked 18 years ago.
    Edmonton first, everything else second.

  100. #200
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,791

    Default

    Thanks very much ThomasH