    Distance to the horizon 56.6 Kilometres

    http://www.ringbell.co.uk/info/hdist.htm

  2. #4502
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    10,887

    Default

    I think trees prevent seeing the towers downtown, at some locations.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  3. #4503

    Default

    Quote Originally Posted by kkozoriz View Post
    Distance to the horizon 56.6 Kilometres

    http://www.ringbell.co.uk/info/hdist.htm
    What about the horizon line? That is just the point where the sky meets land point. Tall objects Stantec will still stand out from that line- although quite small.
    " The strength of a man is in the stride he walks."

  4. #4504

    Default

    That distance is based on the height of 250.8 metres given in the thread title. From the top, you can see 56.6 km/ . Inversely, from the same distance, you should see the top of the tower.

    For example, at my height of 1.75 m, the horizon is about 4.7 km.

    Try different numbers and see what you get.

  5. #4505

    Default

    I understand what you were trying to say before you even uploaded all the information. All that info was part of my highschool art 10 class from highschool over 3 decades ago. I think you are explaining the "vanishing point."
    " The strength of a man is in the stride he walks."

  6. #4506
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default





    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  7. #4507

    Default

    3 residential floor left then 3 service floors. Should be topped by the end of August.

  8. #4508
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default


    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  9. #4509
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,386

    Default

    Quote Originally Posted by ctzn-Ed View Post
    Once it reaches the final height, i would assume it would be vissible about an hour's drive outside of the city as ur landscape is pretty much even elevation all around. It shouldn't be much different than our drive to Calgary where their towers are visible roughly an hour away.
    It's visible from the cemetery hill east of Ardrossan and near the Doppler radar station around Carvel

  10. #4510
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,911

    Default

    Calgary’s are down by the river with a hill in front. Coming in on the QE2 and Deerfoot you only see the top half of the skyscrapers. Coming into the Bow Valley on 17th from Forest Lawn and Bow Trail from the west are great views. Crescent Road on the north hill, Salisbury St. on Scotsman’s hill are great and from the south coming in over the hill of the Chinese cemetery on Macleod.
    Last edited by Drumbones; 07-07-2018 at 03:51 PM.

  11. #4511
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default


    @wherezjeff
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  12. #4512
    Becoming a C2E Power Poster
    Join Date
    Mar 2016
    Location
    Southwest YEG
    Posts
    209

    Default

    ^ Jeff Wallace is my favorite local photographer. His work is stunning. Thanks for sharing. Your pics are great as well IanO.

  13. #4513
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default

    He really is quite an amazing photographer.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  14. #4514

    Default

    They seem to be placing metal bracing on the elevator shaft on the east side in areas where they haven't put glazing. Anyone know what they might be doing here?

  15. #4515
    I'd rather C2E than work!
    Join Date
    Mar 2006
    Location
    Strathearn, Edmonton
    Posts
    4,281

    Default

    Quote Originally Posted by edmguy111 View Post
    They seem to be placing metal bracing on the elevator shaft on the east side in areas where they haven't put glazing. Anyone know what they might be doing here?
    Steel stud, exterior drywall, metal paneling.

  16. #4516
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default




    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  17. #4517
    Becoming a C2E Power Poster
    Join Date
    Oct 2013
    Location
    Oliver
    Posts
    295

    Default

    On the 65th floor now. 1 more residential floor, 3 mechanical floors, and this is topped off.

  18. #4518

    Default

    First wave of Stantec staff move in Sept 15. Is it clear yet where the main office access doors are on the building? I know the lobby is on 3/4 but imagine there's elevator/escalator directly to there without having to work up through the podim. Curious how they'll manage that with the continuing construction above.

  19. #4519
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default


    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  20. #4520
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default


    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  21. #4521
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default






    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  22. #4522

    Default

    This aft.





  23. #4523

    Default

    Looking awesome
    "Do you give people who already use transit a better service, or do you build it where they don't use it in the hopes they might start to use it?" Nenshi

  24. #4524

    Default

    Was that the last residential floor finished yesterday? 3 mechanical / elevator floors left?

  25. #4525
    First One is Always Free
    Join Date
    Jan 2015
    Location
    St Albert but work in Edmonton
    Posts
    27

    Default

    Quote Originally Posted by Concrete Jungle View Post
    Was that the last residential floor finished yesterday? 3 mechanical / elevator floors left?
    Just did a floor count from the webcam... and I think they are just getting to the slab for floor 65. They should have two more floor slabs to pour... lvl 66 floor and the floor slab of the first level of the mechanical penthouse.

  26. #4526
    Becoming a C2E Power Poster
    Join Date
    Oct 2013
    Location
    Oliver
    Posts
    295

    Default

    My count was that they are working on the 66th floor now. Either way, close to being done.

  27. #4527
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default


    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  28. #4528
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default

    A few more angles.








    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  29. #4529
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  30. #4530
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default


    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  31. #4531
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default


    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  32. #4532

  33. #4533

    Default

    From July 15, 2018.




  34. #4534
    Becoming a C2E Power Poster
    Join Date
    Mar 2016
    Location
    Southwest YEG
    Posts
    209

    Default

    Quote Originally Posted by IanO View Post

    @wherezjeff
    Fantastic!! I wonder if Encore or Tower BG will show from this angle much. The CWB building would block them from view I'm guessing.
    Skyscraper Enthusiast

  35. #4535

    Default Stantec Move

    Quote Originally Posted by jm47 View Post
    First wave of Stantec staff move in Sept 15. Is it clear yet where the main office access doors are on the building? I know the lobby is on 3/4 but imagine there's elevator/escalator directly to there without having to work up through the podim. Curious how they'll manage that with the continuing construction above.
    I am just curious if you work there or how do you know that the first move is Sept 15?

  36. #4536
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default




    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  37. #4537
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton, Alberta
    Posts
    4,539

    Default

    Quote Originally Posted by S3RI3S View Post
    Crane jumped! Probably final height for it?
    They have brought in more segments to raise the crane again.
    “Canada is the only country in the world that knows how to live without an identity,”-Marshall McLuhan

  38. #4538

    Default

    Obtained with permission from a friend who works at stantec.


  39. #4539
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default

    What a perspective?
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  40. #4540
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  41. #4541
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default

    Blueskin going up on Stantec.


    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  42. #4542

    Default

    Stantec crane got bumped up again today. Surely for the last time now.

  43. #4543

    Default

    I don't understand why they had the "window" opening in that concrete shaft but now they're covering up. What was the point of that?

  44. #4544

    Default

    Quote Originally Posted by Axb View Post
    I don't understand why they had the "window" opening in that concrete shaft but now they're covering up. What was the point of that?
    Could have provided positive pressure for the shaft? not sure.

  45. #4545
    C2E Continued Contributor
    Join Date
    Jul 2015
    Location
    Downtown Edmonton
    Posts
    1,454

    Default

    Quote Originally Posted by S3RI3S View Post
    Obtained with permission from a friend who works at stantec.

    Awesome shots man.

  46. #4546
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,911

    Default

    We need a high viewing floor in town. I used to go up to Vista 33 often and was disappointed when they closed it. Hoping for something soon. I still go up the Calgary Tower two or three times a year. SonnyBoy loves to go up.

  47. #4547
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  48. #4548
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    10,887

    Default

    I'd be very scared viewing Edmonton from that crane. Awesome shots!
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  49. #4549
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,911

    Default

    They are great. All great with the new towers. Edmonton is looking like Dallas,Texas these days.
    Last edited by Drumbones; 22-07-2018 at 01:06 PM.

  50. #4550
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    31,162

    Default

    ^^^ OK I give up, whereabouts was this shot taken?
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  51. #4551

    Default

    Quote Originally Posted by Sonic Death Monkey View Post
    ^^^ OK I give up, whereabouts was this shot taken?
    From the link:

    Yes, This was the view from my hotel room @RiverCreeCasino using a 200mm Zoom & yes that is Commonwealth in there too!

  52. #4552
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default


    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  53. #4553

    Default

    This is interesting, it looks like the core is going to slope up to meet the top of the building? I don't remember seeing this in any of the renderings.


  54. #4554

    Default

    Looks like the last of the concrete floors have been poured. That appears to be the steel for the mechanical levels.
    Last edited by Concrete Jungle; 25-07-2018 at 10:45 AM.

  55. #4555
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default

    My guess is not sloped, but rather braced diagonally for shear/strength.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  56. #4556
    Becoming a C2E Power Poster
    Join Date
    Apr 2007
    Location
    Calgary, Alberta
    Posts
    149

    Default

    Quote Originally Posted by issue43 View Post
    This is interesting, it looks like the core is going to slope up to meet the top of the building? I don't remember seeing this in any of the renderings.

    That's it. This is officially Canada's tallest outside of Toronto.
    Last edited by RicoLance21; 25-07-2018 at 06:00 PM.

  57. #4557
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default

    Does that steel put Stantec above BP and little old Edmonton above not only Calgary, but all of Canada outside of Toronto?


    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  58. #4558

    Default

    Quote Originally Posted by kkozoriz View Post
    Distance to the horizon 56.6 Kilometres

    http://www.ringbell.co.uk/info/hdist.htm

    so to the south you should be able to see Millet, to the north Legal, close to Wabamun to the west and at least to Elk Island to the east. that's pretty damned sweet !!

  59. #4559
    Becoming a C2E Power Poster
    Join Date
    Apr 2007
    Location
    Calgary, Alberta
    Posts
    149

    Default

    Quote Originally Posted by RicoLance21 View Post
    Quote Originally Posted by issue43 View Post
    This is interesting, it looks like the core is going to slope up to meet the top of the building? I don't remember seeing this in any of the renderings.

    That's it. This is officially Canada's tallest outside of Toronto.
    Hmm...looks like there is still one more floor to go, plus mechanical floor slab on top. I don’t think it has topped out just yet.

  60. #4560
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,789

    Default

    Thats what I thought.

  61. #4561

    Default

    Quote Originally Posted by IanO View Post
    Does that steel put Stantec above BP and little old Edmonton above not only Calgary, but all of Canada outside of Toronto?
    @ianoyeg
    Yes, according to http://skyscraperpage.com/diagrams/?countryID=1 Stantek is the ninth tallest in Canada, the first eight being in Toronto. CN Tower is a "structure" not a building?
    So, here: https://en.wikipedia.org/wiki/List_o...ings_in_Canada it is ranked number eight.

  62. #4562
    Becoming a C2E Power Poster
    Join Date
    Aug 2009
    Location
    Edmonton
    Posts
    399

    Default

    Quote Originally Posted by K364 View Post
    Quote Originally Posted by IanO View Post
    Does that steel put Stantec above BP and little old Edmonton above not only Calgary, but all of Canada outside of Toronto?
    @ianoyeg
    Yes, according to http://skyscraperpage.com/diagrams/?countryID=1 Stantek is the ninth tallest in Canada, the first eight being in Toronto. CN Tower is a "structure" not a building?
    So, here: https://en.wikipedia.org/wiki/List_o...ings_in_Canada it is ranked number eight.
    It's currently the 5th tallest building in Canada if you go by roof height.
    'The One' is not yet completed, and the rooflines of both Adelaide Hotel and TD Tower are far lower than Stantec.

  63. #4563

    Default


    DSC08997
    by b/c, on Flickr

  64. #4564
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,789

    Default

    When do they hoist the surprise spire?
    Last edited by EdmTrekker; 28-07-2018 at 03:44 PM.

  65. #4565

    Default

    Nice photo B.ike! ... she sure is a beast and the pair compliment one another very well.

  66. #4566

    Default

    Quote Originally Posted by B.ike View Post

    DSC08997
    by b/c, on Flickr
    I don't usually comment on pictures, but this is very nicely set up with the trees in front, the Rogers Place sign behind it and the buildings behind it. Great shot!

  67. #4567
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default

    Indeed. Beautifully composed.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  68. #4568
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,789

    Default

    What is the small brown concrete building beside Manulife in that picture?

  69. #4569
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default

    10065 Jasper Avenue aka Jacobs (Engineering) Tower.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  70. #4570
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,789

    Default

    Quote Originally Posted by IanO View Post
    10065 Jasper Avenue aka Jacobs (Engineering) Tower.
    Thanks - I could not get my head around that angle. Odd that building made the background but not Scotia Place. Interesting angle in that wonderful picture. Far to the right it looks CIBC Centre peaking through but maybe I am wrong on that.
    Last edited by EdmTrekker; 29-07-2018 at 09:47 AM.

  71. #4571
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default

    Commerce.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  72. #4572
    C2E Continued Contributor
    Join Date
    Jul 2015
    Location
    Downtown Edmonton
    Posts
    1,454

    Default

    Manulife in the picture saying: “don’t forget about me!”

  73. #4573
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  74. #4574
    Becoming a C2E Power Poster
    Join Date
    Mar 2016
    Location
    Southwest YEG
    Posts
    209

    Default

    ^Stunning pic by Jeff. Probably one of my favorites of his. Thanks again IanO .
    Skyscraper Enthusiast

  75. #4575

    Default

    Indeed. Great patience and capture
    " The strength of a man is in the stride he walks."

  76. #4576
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    10,887

    Default

    It’s almost as high as the Moon!
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  77. #4577
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default


    @chrisbuyze
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  78. #4578

    Default

    Link to source!!?

  79. #4579
    C2E Hard Core Contributor
    Join Date
    Jan 2012
    Location
    Sherwood park
    Posts
    2,478

    Default

    OMG! Look at all those trees on a south facing slope. Crazy!

  80. #4580

    Default

    That gorgeous natural park we dont use only to build more inlet parks that no one uses?
    I did a bike ride today and "OMG" sounds about right.

    One of my favorite angle.
    " The strength of a man is in the stride he walks."

  81. #4581

    Default

    https://www.facebook.com/StantecInc/...53778231330108

    It’s almost time for our Edmonton teams to move into our new Company headquarters, the Stantec Tower! Yesterday, signage from our Bell Tower office came down, in the shadow of our future home. It’s hard to believe that employees will be moving in a few short months! For those interested in a construction update – as of today, the 65th floor has been poured (with 2 typical floors and a two storey mechanical room to go) and the Tower is standing at 230 metres tall - reaching our maximum height of 251 metres at the end of 2018!

    A bit confused by the floor count in that post, I thought all the standard floors had been poured but they're saying there's still 2 to go? They're already onto the steel.

  82. #4582
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    31,162

    Default

    https://twitter.com/Stantec/status/1025110261714173957

    Stantec‏ @Stantec
    In a few months, our Edmonton team will begin moving into the Stantec Tower! Yesterday, signage from one of our offices came down, across from our future home. The 65th floor has been poured (with 2 + to go) and it’s 230 metres tall. Max height will be reached at the end of 2018!
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  83. #4583
    I'd rather C2E than work!
    Join Date
    Feb 2009
    Location
    Westmount, Edmonton
    Posts
    5,541

    Default

    Building Trades posted a bunch of pics on Facebook from the top:

    https://www.facebook.com/BuildingTra...71735709676420


    "For every complex problem there is an answer that is clear, simple, and wrong"

  84. #4584
    Becoming a C2E Power Poster
    Join Date
    Mar 2012
    Posts
    453

    Default

    That's a great photo. Almost a modern classic.

  85. #4585
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,806

    Default

    Incredible shot.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  86. #4586

    Default

    WOW! Wish i could be up there with them.
    " The strength of a man is in the stride he walks."

  87. #4587

    Default

    Such a cool shot, new perspective on Edmonton!
    www.decl.org

  88. #4588

    Default

    man, I get the heebies just from that pic...
    I am in no way entitled to your opinion...

  89. #4589

    Default

    Quote Originally Posted by Paul Turnbull View Post
    Building Trades posted a bunch of pics on Facebook from the top:

    https://www.facebook.com/BuildingTra...71735709676420

    incredible how us beings so small can build things so large, awesome pic.

  90. #4590
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,789

    Default

    Quote Originally Posted by S3RI3S View Post
    Quote Originally Posted by Paul Turnbull View Post
    Building Trades posted a bunch of pics on Facebook from the top:

    https://www.facebook.com/BuildingTra...71735709676420

    incredible how us beings so small can build things so large, awesome pic.
    We build ourselves - people kind are a remarkable species.

  91. #4591
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    10,887

    Default

    It's like the old Empire State Building construction.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  92. #4592

    Default

    But only 2/3rd the size.

  93. #4593
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,789

    Default

    "The tower, when finished this Fall, will be 66 stories (251 m in height)." Not the 69 stated in this threads header.

    https://www.facebook.com/BuildingTra...71735709676420

    There are 5 photos.

  94. #4594

    Default

    Quote Originally Posted by EdmTrekker View Post
    "The tower, when finished this Fall, will be 66 stories (251 m in height)." Not the 69 stated in this threads header.
    Yeah, no. It's 69.

    Wait a minute. Are they wearing safety harnesses? Pussies ...

  95. #4595

    Default

    Quote Originally Posted by Spill View Post
    Quote Originally Posted by EdmTrekker View Post
    "The tower, when finished this Fall, will be 66 stories (251 m in height)." Not the 69 stated in this threads header.
    Yeah, no. It's 69.

    Wait a minute. Are they wearing safety harnesses? Pussies ...
    yeah **** osha and **** wanting to come home alive

  96. #4596
    I'd rather C2E than work!
    Join Date
    Feb 2009
    Location
    Westmount, Edmonton
    Posts
    5,541

    Default

    Quote Originally Posted by Spill View Post
    Quote Originally Posted by EdmTrekker View Post
    "The tower, when finished this Fall, will be 66 stories (251 m in height)." Not the 69 stated in this threads header.
    Yeah, no. It's 69.
    You should go over and correct Stantec's site then:

    a total of 251 metres (823 feet). Once completed, it will stand at 66 storeys
    https://www.stantec.com/en/about-us/...llest-building

    The caveat, of course is that 67, 68, and 69 are mechanical floors, but that's not defined as the usable space of a building. Probably just better off sticking to height.
    Last edited by Paul Turnbull; 03-08-2018 at 12:49 AM.

    "For every complex problem there is an answer that is clear, simple, and wrong"

  97. #4597
    I'd rather C2E than work!
    Join Date
    Feb 2009
    Location
    Westmount, Edmonton
    Posts
    5,541

    Default

    Out of curiosity, does Vancouver have height restrictions? It's curious so few of the really tall buildings in Canada are there.

    "For every complex problem there is an answer that is clear, simple, and wrong"

  98. #4598

    Default

    Quote Originally Posted by Dark Magnus View Post
    Quote Originally Posted by Spill View Post
    Quote Originally Posted by EdmTrekker View Post
    "The tower, when finished this Fall, will be 66 stories (251 m in height)." Not the 69 stated in this threads header.
    Yeah, no. It's 69.

    Wait a minute. Are they wearing safety harnesses? Pussies ...
    yeah **** osha and **** wanting to come home alive
    First, what is "osha?"

    Secondly,OSSA has nothing to do with harness. OSSA is a standard protocol practice that was implemented by four Oilsand companies for their standards whch was adopted by every other developnent in the Oilsands.
    Final, the harness is due to the construction bible known as OH&S that we have to adhere to unless we want a hefty fine or jail if something happen,; or, we're caught in person for violating any construction law. For harness, it is mandatory at 11" or higher. However, all major construction projects appear to have adopted OSSA's standard when working at height which is 6" or higher. They're are not pussies; they just want to hug their wives and kids, and one can't do that if they're dead.
    " The strength of a man is in the stride he walks."

  99. #4599

    Default

    Quote Originally Posted by ctzn-Ed View Post
    Quote Originally Posted by Dark Magnus View Post
    Quote Originally Posted by Spill View Post
    Quote Originally Posted by EdmTrekker View Post
    "The tower, when finished this Fall, will be 66 stories (251 m in height)." Not the 69 stated in this threads header.
    Yeah, no. It's 69.

    Wait a minute. Are they wearing safety harnesses? Pussies ...
    yeah **** osha and **** wanting to come home alive
    First, what is "osha?"

    Secondly,OSSA has nothing to do with harness. OSSA is a standard protocol practice that was implemented by four Oilsand companies for their standards whch was adopted by every other developnent in the Oilsands.
    Final, the harness is due to the construction bible known as OH&S that we have to adhere to unless we want a hefty fine or jail if something happen,; or, we're caught in person for violating any construction law. For harness, it is mandatory at 11" or higher. However, all major construction projects appear to have adopted OSSA's standard when working at height which is 6" or higher. They're are not pussies; they just want to hug their wives and kids, and one can't do that if they're dead.
    https://en.wikipedia.org/wiki/Occupational_Safety_and_Health_Administration

    https://www.reddit.com/r/OSHA/

  100. #4600
    Becoming a C2E Power Poster
    Join Date
    Feb 2008
    Location
    Parkview
    Posts
    310

    Default

    Quote Originally Posted by Paul Turnbull View Post
    Out of curiosity, does Vancouver have height restrictions? It's curious so few of the really tall buildings in Canada are there.
    Yes, Vancouver has height restrictions due to view cones.

    https://vancouver.ca/home-property-d...ers-views.aspx
    Edmonton is a very exciting place to be right now.

Page 46 of 49 FirstFirst ... 364243444546474849 LastLast

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •