    Trans-Canada Highway in Langley to be expanded to 6 lanes
    Will expand 8 kilometre section from 216th Street to 264th Street
    http://www.cbc.ca/news/canada/britis...gley-1.4044381
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  2. #302

    Default

    That widening in Langley is desperately needed.

  3. #303
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    This was announced in April, not sure what impact the election will have on these 3 projects.

    They finally will tender twinning 2.5 km east of the Donald truck scales, they only announced this project about 3 or more years ago.
    https://news.gov.bc.ca/releases/2017TRAN0157-001031

    Plus 1.5 km prep work (soil improvements for the road base) west of Salmon Arm and twinning 3.4 km west of Chase.
    Last edited by sundance; 18-06-2017 at 04:06 PM.

  4. #304
    Becoming a C2E Power Poster
    Join Date
    Dec 2008
    Posts
    302

    Default

    twinning the yellowhead completely from manitoba to a vancouver terminus should be a national project, equal in scope to the building of the railroads. too bad the feds and provinces didn't get together and make this a gift to the nation on the 150th anniversary. so too TCH1.
    (edit) I drove the yh a couple of years ago from the start in manitoba to saskatoon; most of it is not only single lane, but old narrow single lane; slow and scary. i'll not drive it again until it's upgraded.
    Last edited by buildings; 18-06-2017 at 02:45 PM.

  5. #305
    C2E Hard Core Contributor
    Join Date
    Aug 2010
    Location
    Crawford Plains, Millwoods since 1985
    Posts
    2,737

    Default

    Since when does the Yellowhead end in Vancouver? Isn't it Prince Rupert?
    Time spent in the Rockies is never deducted from the rest of your life

  6. #306
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    Highway 5 in BC is also the Yellowhead so it ends at the Trans-Canada near Hope.
    http://www.transcanadayellowhead.com

    The majority of traffic takes Highway 11 in Saskatoon from Saskatoon to Regina then on to Winnipeg, so there really isn't a sufficient need to twin from Saskatoon to Portage La Prairie, Highway 11 and 1 is already twinned and is only about 45 km longer then the Yellowhead.
    https://www.google.ca/maps/dir/Saska...1!2d49.9723205

  7. #307
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    10,764

    Default

    I wonder if Highway 5 could have more climbing/passing lanes where needed. Same with Highway 16, the BC side.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  8. #308
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,740

    Default

    Quote Originally Posted by sundance View Post
    This was announced in April, not sure what impact the election will have on these 3 projects.

    They finally will tender twinning 2.5 km east of the Donald truck scales, they only announced this project about 3 or more years ago.
    https://news.gov.bc.ca/releases/2017TRAN0157-001031

    Plus 1.5 km prep work (soil improvements for the road base) west of Salmon Arm and twinning 3.4 km west of Chase.
    I can't really see the BC NDP killing these projects. Not when there's federal funding involved.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  9. #309
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    NDP or Green already announced they are killing the Massey Tunnel replacement bridge. My guess is they might kill Kicking Horse Canyon phase 4 too.

  10. #310
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,740

    Default

    Welp, guess we can kiss the Massey Tunnel Replacement Bridge bye bye then.
    I still doubt the BC NDP will kill the TCH projects because unlike the Massey project there's really not that much outcry against them, but who knows with these guys, so I guess we'll wait and see.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  11. #311

    Default

    wait why are the left opposed to the replacement bridge?

    it creates jobs; it will be a safer, more earthquake proof solution; and finally it will ease the crossing gridlocks experienced everyday almost every hour between 7am and 6pm.

  12. #312
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    Green-suspend work and review alternatives.
    NDP-consult with regional mayors and then consider which course to follor.

    So in the end probably nothing will be done because the whole consultation process will probably last longer then their government.

  13. #313
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    NDP does propose to eliminate tolls on the Port Mann and Golden Ears bridges, however the City of Vancouver wants some sort of extra usage tax (they already have a special city gas tax)
    http://globalnews.ca/news/3494548/th...be-on-the-way/
    Last edited by sundance; 07-07-2017 at 12:05 PM.

  14. #314
    C2E Continued Contributor
    Join Date
    Sep 2013
    Location
    I don't even know anymore :/
    Posts
    1,055

    Default

    Quote Originally Posted by B.ike View Post
    wait why are the left opposed to the replacement bridge?

    it creates jobs; it will be a safer, more earthquake proof solution; and finally it will ease the crossing gridlocks experienced everyday almost every hour between 7am and 6pm.
    It also:
    - Promotes sprawl (Vancouver has a very limited amount of agricultural land left if you weren't aware), and therefore SOV use
    - It is massively overbuilt to the point were it wouldn't be operating at an effective LOS for at least a decade after it was built, meanings it's way more expensive than it needs to be
    - There wasn't sufficient study and research of other options
    - A lot of people expect that part of the reason for it is to open the river up for shipping, which comes with huge environmental risks
    - It goes against the regional planning the area has been doing for decades
    - And finally, the biggest one I think. It doesn't solve any congestion issues, in fact it might even make them worse. Unless the city of Vancouver tears 8-10 lanes over the Oak street bridge, and downs oak street, the traffic problems will still be there, just moved down into Richmond and Vancouver. Which is much worse, instead of backing up into what is mostly agricultural land at the moment, it will back up into Vancouver and Richmond, incapacitating flow not only onto the highway, but also any E-W travel in the area as traffic backs up onto the off and on ramps in richmond, and the corridors in Vancouver.

    I actually had a look at the engineering/planning documents, and there was not a single traffic study done in the surrounding areas, only in the direct vicinity (sounds familiar to us Edmontonians eh?).

    Also I don't see how this is a left/right issue, this is a planning issue.

  15. #315
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    I'd imagine a bridge is easier and cheaper to harden against earthquakes than an underwater tunnel. Typically tunnels cost 2-3x the cost of a bridge. Let's say the NDP/Green go with a tunnel, would they just build a new tube and use both the new and old tubes, or would they build one tunnel wide enough for all lanes or two new tunnels for SB and NB traffic and decommission the old tunnel.

    Regardless a proper study with all bridge and tunnel options will take a year or 2 to complete, probably longer then the minority government will last.

    Found this on page 66 of the BC NDP Platform
    We will build, maintain and upgrade highways across the province, including completing Highway 1 upgrades to the Alberta border, and will upgrade interchanges and crossings to make our roads safer.
    https://action.bcndp.ca/page/-/bcndp...17.pdf#page=66

  16. #316
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,740

    Default

    Tolls to be eliminated on Port Mann and Golden Ears bridges

    The B.C. government is getting rid of tolls on the Port Mann and Golden Ears bridges starting Sept. 1, Premier John Horgan has announced.
    Horgan made the announcement in Port Coquitlam on Friday morning, with Transportation Minister Claire Travena and Housing Minister Selina Robinson at his side.
    "These tolls are unfair to people who live in the Lower Mainland and to people who live in particular areas of British Columbia. If you live in Kelowna you don't pay tolls to cross a bridge," Horgan said. "You shouldn't have to pay tolls because of where you live."
    Elimination of the tolls was a key element of the NDP's election campaign this spring.
    Previously, when critics pointed out that the move would mean a loss of $200 million in revenue for the government, Horgan suggested the cost would be spread across the province.
    More to come.
    http://www.cbc.ca/news/canada/britis...n-bc-1.4261972
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  17. #317
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,603

    Default

    I've crossed a few times without paying but have never gotten a ticket, AB plates I guess. Good move because I noticed these bridges are underused with people avoiding them and putting more stress on other bridges and routes. Campaign promises apply.
    Last edited by Drumbones; 25-08-2017 at 12:14 PM.

  18. #318
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,740

    Default

    Likewise, I have driven across the Port Mann a couple of times since it opened and never received a toll ticket in the mail. I believe there's some kind of jurisdictional issue that prevents them from charging to out-of-province license plates.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  19. #319

    Default

    ^^Bad move because if what you want is well maintained, uncongested bridges the right thing to do is toll all of them.
    There can only be one.

  20. #320
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,603

    Default

    Ha ha, very funny

  21. #321
    I'd rather C2E than work!
    Join Date
    Mar 2006
    Location
    Edmonton (Norwood)
    Posts
    4,447

    Default

    Quote Originally Posted by Highlander II View Post
    ^^Bad move because if what you want is well maintained, uncongested bridges the right thing to do is toll all of them.
    Agreed. I'm not normally a big fan of road tolls, but Vancouver/Burnaby/Richmond/New West/(Port)Coquitlam are a sort of pseudo-island that is only accessible by a handful of long, tall, expensive bridges. Putting an equal toll on all 7 of them to fund ongoing upgrades would make sense.

  22. #322
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    10,764

    Default

    I wonder if having a national-park-style toll would work for the bridges. One for four days, another for 30 and another for all year.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  23. #323
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    Trans-Canada mountainous route can be death-defying, but hope lies ahead
    Kevin Brooker, Swerve Kevin

    ...Your heart may have skipped a beat upon spying the B.C. government signs trumpeting tax dollars at work in what reads like a latter-day miracle: “Kamloops to Alberta Four-laning Program.”Seriously? Is this something that could actually occur in our lifetime?

    Spoiler alert: Be prepared to live a long time yet. ...
    http://edmontonjournal.com/life/swer...e-5d84af15010d

  24. #324
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,740

    Default

    Don't think this was mentioned yet but there are plans to replace the Bruhn Bridge in Sicamous.
    https://www2.gov.bc.ca/gov/content/t...w-bruhn-bridge
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  25. #325
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    2018 budget mentions pretty much what we know already, Salmon Arm west, Sicamous, near Chase. Kicking Horse Phase 4 is budgeted, hopefully construction will start soon
    http://bcbudget.gov.bc.ca/2018/sp/pd...an.pdf#page=21

  26. #326
    C2E SME
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    10,413

    Default

    They really need to do something about Roger's Pass. This winter has been brutal for frequent closures due to the high snowfall. The best solution is likely to tunnel, as the railroad figured out 50+ years ago. Our national highway shouldn't be closing for a day at a time or more on a regular basis.

  27. #327
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    The latest plans have no tunnels or snowsheds
    https://www.th.gov.bc.ca/kickinghors...-D_REDUCED.jpg

  28. #328
    C2E SME
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    10,413

    Default

    Looks like they're mostly going to rely on fences and ditches to contain avalanches and rock falls. My understanding is that the Kicking Horse avalanches aren't nearly as big as what they have to deal with in Rogers. A couple weeks ago when it was closed, it was because one of the controlled avalanches was so big it buried one of the snow sheds in 40-60 feet of snow and 5-10 km of highway.

    https://604now.com/controlled-avalan...tish-columbia/

  29. #329
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,740

    Default

    Nary a peep re: George Massey Tunnel replacement except that they're telling people a bridge would be far cheaper than a tunnel.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  30. #330
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    To be honest neither the NDP nor Greens want to build a highway bridge. So they'll delay and stall, request yet another study, until its time for the next election.

  31. #331

    Default

    Why are Albertans worried about a highway in BC? Aren't we all supposed to be boycotting them?

  32. #332

    Default

    I'm not going to let Notley tell me what to do in a little trade war spat.

  33. #333
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    I was in Jasper and it looks like they are finally building a bypass lane around the east gate in Jasper NP.
    ---
    East Gate project in Jasper National Park

    Beginning on March 27, 2018, Parks Canada is undertaking work to reconstruct the East Gate on the Yellowhead Highway (Highway 16) in Jasper National Park. Once construction is complete, the East Gate will see many improvements including a third kiosk entry lane, a fourth lane to act as a bypass for through traffic, and overhead electronic signage.*
    https://www.pc.gc.ca/en/pn-np/ab/jas.../carte-FII-map

  34. #334
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,740

    Default

    Great news about the Jasper park gate, especially the bypass kiosk!
    Next on the list is the twinning of Hwy 16 from Hinton to the JNP gate - need to move this from "planning" to the next steps.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  35. #335

    Default

    What happened to the Edson and Hinton bypasses? Those are worth spending money on.

  36. #336
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    Not for the NDP, transportation will receive very little of the spending, whereas Health, Education and Advanced Education will receive most of the spending (I can't find the 2018 budget)

    https://www.macleans.ca/economy/econ...ut-the-budget/
    Last edited by sundance; 27-05-2018 at 09:51 PM.

  37. #337
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,740

    Default

    To put it bluntly, the Hinton and Edson bypasses need to move from "planning" to the next steps.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  38. #338

    Default

    Same with many infrastructure and transportation projects around the province... However, the NDP seem to have no appetite for anything beyond the bare minimums in regional highway improvements, like the much needed third-laning of the SW Henday, overdue since 2009.

  39. #339
    Becoming a C2E Power Poster
    Join Date
    Dec 2008
    Posts
    302

    Default

    having just driven Edmonton / Jasper / Kamloops / Merritt / Kelowna / Revelstoke / Golden / Edmonton for the first time in many years, I can say that many improvements have been made. (aside from Kelowna... that's a lost cause). I feel twinning from Jasper to Kamloops makes the most sense for Edmonton and northern Alberta to the coast. Hwy 1 is much improved except for east of Golden; don't know what can be done there short of tunneling.

  40. #340

    Default

    Quote Originally Posted by K364 View Post
    What happened to the Edson and Hinton bypasses? Those are worth spending money on.
    Why?

  41. #341
    C2E SME
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    10,413

    Default

    Quote Originally Posted by buildings View Post
    having just driven Edmonton / Jasper / Kamloops / Merritt / Kelowna / Revelstoke / Golden / Edmonton for the first time in many years, I can say that many improvements have been made. (aside from Kelowna... that's a lost cause). I feel twinning from Jasper to Kamloops makes the most sense for Edmonton and northern Alberta to the coast. Hwy 1 is much improved except for east of Golden; don't know what can be done there short of tunneling.
    No tunnels. There's going to be a bunch of cantilevered road structures, and it's funded: https://www.canadianconsultingengine...09/1003404809/

    So that'll take care of the last section East of Golden. I hadn't found that last 10-15 km too bad in recent years, even in the winter, save for the occasional closure for avalanche control. Now the main work remains between Golden/Revy. That will need either large amounts of avalanche sheds or huge tunnels. CP Rail realized Rogers Pass was a terrible route 100 years ago because of the massive avalanche risks and tunneled under it. You wonder when our Federal government will figure it out.

    Quote Originally Posted by KC View Post
    Quote Originally Posted by K364 View Post
    What happened to the Edson and Hinton bypasses? Those are worth spending money on.
    Quote Originally Posted by KC View Post
    Why?


    Hinton isn't too much of a priority. It's a mix of 60 and 80, there's only a few lights, and little cross traffic. Edson badly needs a bypass as it's right through their main street, 50 for all of it, with a ton of lights, pedestrians etc. A main trucking route shouldn't rumble right through town like that.
    Last edited by Marcel Petrin; 29-05-2018 at 10:53 AM. Reason: Board keeps breaking up the quote for some reason.

  42. #342
    C2E Continued Contributor
    Join Date
    Oct 2007
    Location
    Edmonton, AB
    Posts
    1,392

    Default

    ^ I agree that speed is an issue/consideration, however, there is a grand total of one traffic light each way in Edson, not a 'ton'. By my recollection, there are at least four sets on Hwy 16 through Hinton.

  43. #343
    C2E SME
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    10,413

    Default

    You're correct! I guess it just seems that much slower due to the lower limit.

  44. #344
    C2E Junkie *
    Join Date
    Feb 2006
    Location
    Edmonton
    Posts
    13,737
    Blog Entries
    1

    Default

    As a too frequent driver of that route, I agree it seems slower. Especially when traffic gets large, trying to get back onto the highway is hard.

    ...but I don't think you'll see a bypass anytime soon. Not only does Edson politically not want it (the business community keeps saying it will "kill" the town as people are enticed to stop), but for the few minutes it saves on the overall drive, it is an expensive bypass.

    Hinton...same.

    Now, should they finally get off their collective derrieres and twin 5 through the North Thompson (where nature already carved the route save Avola), and you can get 16 completed to Tete Jaune...that would save tons of time, improve safety tremendously, and be worth the investment. I'd even pay a toll...
    Since calm logic doesn't work, I guess it is time to employ sarcasm. ...and before you call me an a-hole...remember, I am a Dick.

  45. #345

    Default

    Quote Originally Posted by Medwards View Post
    Same with many infrastructure and transportation projects around the province... However, the NDP seem to have no appetite for anything beyond the bare minimums in regional highway improvements, like the much needed third-laning of the SW Henday, overdue since 2009.
    Yes, the NDP in three years still haven't fixed all the problems they inherited from 80 years of right-wing governments. Thanks Obama!

  46. #346
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,740

    Default

    ^^^ Even with just one set of traffic signals (really, just one?), Edson still goes slow due to 50 km/hr. Having a bypass ensures that highway speeds will be no less than 90 km/hr. Same deal with Hinton for that matter.
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  47. #347

    Default

    Quote Originally Posted by K364 View Post
    Quote Originally Posted by Medwards View Post
    Same with many infrastructure and transportation projects around the province... However, the NDP seem to have no appetite for anything beyond the bare minimums in regional highway improvements, like the much needed third-laning of the SW Henday, overdue since 2009.
    Yes, the NDP in three years still haven't fixed all the problems they inherited from 80 years of right-wing governments. Thanks Obama!
    Jesus christ. I wasn't really placing blame here, but thank you for being you. Yes, the NDP won't resolve all the issues from previous governments, nor should they try, but they seem to have little interest in fixing/updating/upgrading the highway networks of Alberta. Thanks Merkle!

  48. #348
    I'd rather C2E than work!
    Join Date
    Oct 2007
    Location
    Edmonton
    Posts
    6,645

    Default

    Quote Originally Posted by Medwards View Post
    Same with many infrastructure and transportation projects around the province... However, the NDP seem to have no appetite for anything beyond the bare minimums in regional highway improvements, like the much needed third-laning of the SW Henday, overdue since 2009.
    From conversations I've had with people who would know things, there is some movement happening on SW Henday. No firm dates or budgets, but things are being discussed and pre-planned.

  49. #349

    Default

    Brian Mason stated in Oct 2017 that they are working on the design for the SW Henday, but there is no funding for it in the 3-year capital plan....

    But

    The Henday was designed with many stages. We are at stage 2 of 5. I'm not sure what needs to be designed as that was all pre-planned years ago, and when traffic hits certain levels, they were just suppose to roll out plans. Traffic levels now should have us at stage 4 of 5....

    When the SW Henday was first set out to bid, these plans were all on the GOA Transportation website, but after it was tendered, these plans were removed except the initial stage.

    I think Mason is feeding us a line by saying 'work is being done'. It's sad that it's not being considered at all during the 2018-2021 capital budget plan... so we will wait until at least 2021 before it's started, and probably then some.

    link: https://globalnews.ca/news/3835336/a...west-edmonton/

  50. #350
    I'd rather C2E than work!
    Join Date
    Oct 2007
    Location
    Edmonton
    Posts
    6,645

    Default

    Quote Originally Posted by Medwards View Post
    Brian Mason stated in Oct 2017 that they are working on the design for the SW Henday, but there is no funding for it in the 3-year capital plan....

    But

    The Henday was designed with many stages. We are at stage 2 of 5. I'm not sure what needs to be designed as that was all pre-planned years ago, and when traffic hits certain levels, they were just suppose to roll out plans. Traffic levels now should have us at stage 4 of 5....

    When the SW Henday was first set out to bid, these plans were all on the GOA Transportation website, but after it was tendered, these plans were removed except the initial stage.

    I think Mason is feeding us a line by saying 'work is being done'. It's sad that it's not being considered at all during the 2018-2021 capital budget plan... so we will wait until at least 2021 before it's started, and probably then some.

    link: https://globalnews.ca/news/3835336/a...west-edmonton/
    Oh I'm not talking about Mason. Apparently certain aspects of the initial build may not be as 'expansion-ready' as they were meant to be and there is a certain level of rebuild they will have to be done on other things. Sorry for being purposely vague here. I want it build as quickly and properly as possible too, but it's not just a matter of budgeting for it and dusting off the old plans.

  51. #351

    Default

    I guess I could kinda of understand that some things have changed, for example, the province now wants to consider Terwillegar/170st street as a provincial highway in the future, which will mean the Terwillegar/Henday interchange will need to be a full system to system interchange, which the current configuration wont support, nor would the 'ultimate' stage configuration... but we are probably 20+ years away from that.

    To relive the congestion problems, even if just temporary, can we just spend a bit of money and at least add a third lane from gateway to 127/135? This would make a world of difference while we continue to budget/plan for the full extension/modifications required for the long term.

  52. #352
    I'd rather C2E than work!
    Join Date
    Oct 2007
    Location
    Edmonton
    Posts
    6,645

    Default

    Quote Originally Posted by Medwards View Post
    I guess I could kinda of understand that some things have changed, for example, the province now wants to consider Terwillegar/170st street as a provincial highway in the future, which will mean the Terwillegar/Henday interchange will need to be a full system to system interchange, which the current configuration wont support, nor would the 'ultimate' stage configuration... but we are probably 20+ years away from that.

    To relive the congestion problems, even if just temporary, can we just spend a bit of money and at least add a third lane from gateway to 127/135? This would make a world of difference while we continue to budget/plan for the full extension/modifications required for the long term.
    Yeah that would really make a world of difference, as would actually closing the roads that they said they were going to close. Anyway, this is way off-topic for this thread. Just wanted to pipe in to let you know that things are still happening behind the scenes.

  53. #353

    Default

    127th street will still be closed, once the city builds out 135th street with proper ramp room for 111th street! The city is working on it. I agree, there is better places for this conversation. I will stop.

  54. #354
    C2E SME
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    10,413

    Default

    Quote Originally Posted by Alex.L View Post
    Oh I'm not talking about Mason. Apparently certain aspects of the initial build may not be as 'expansion-ready' as they were meant to be and there is a certain level of rebuild they will have to be done on other things. Sorry for being purposely vague here. I want it build as quickly and properly as possible too, but it's not just a matter of budgeting for it and dusting off the old plans.
    Unfortunately, the SW portion is the hardest to expand/modify, as it's the concrete section that was essentially an experiment that they have not repeated since. I seriously doubt Alberta Infrastructure wants the expansion to be concrete, given how poorly the existing portion has performed. I know next to nothing about road building, but I would imagine that's going to present it's difficulties.

  55. #355
    C2E Hard Core Contributor
    Join Date
    Jan 2012
    Location
    Sherwood park
    Posts
    2,384

    Default

    Quote Originally Posted by K364 View Post
    Quote Originally Posted by Medwards View Post
    Same with many infrastructure and transportation projects around the province... However, the NDP seem to have no appetite for anything beyond the bare minimums in regional highway improvements, like the much needed third-laning of the SW Henday, overdue since 2009.
    Yes, the NDP in three years still haven't fixed all the problems they inherited from 80 years of right-wing governments. Thanks Obama!

    So the Social Credit were right wing?

  56. #356

    Default

    Quote Originally Posted by SP59 View Post
    Quote Originally Posted by K364 View Post
    Quote Originally Posted by Medwards View Post
    Same with many infrastructure and transportation projects around the province... However, the NDP seem to have no appetite for anything beyond the bare minimums in regional highway improvements, like the much needed third-laning of the SW Henday, overdue since 2009.
    Yes, the NDP in three years still haven't fixed all the problems they inherited from 80 years of right-wing governments. Thanks Obama!

    So the Social Credit were right wing?
    Yes. And left wing too.

    It’s sometimes tough to slap a single simple-minded label on some things.

  57. #357

    Default

    Quote Originally Posted by SP59 View Post
    Quote Originally Posted by K364 View Post
    Quote Originally Posted by Medwards View Post
    Same with many infrastructure and transportation projects around the province... However, the NDP seem to have no appetite for anything beyond the bare minimums in regional highway improvements, like the much needed third-laning of the SW Henday, overdue since 2009.
    Yes, the NDP in three years still haven't fixed all the problems they inherited from 80 years of right-wing governments. Thanks Obama!

    So the Social Credit were right wing?
    Yes. Wiki says "His" (Manning) "government was one of the most conservative provincial governments in Canada"

    I know where you are coming from. They had some bizarre ideas early on about banking and reverse taxation but these were never implemented except for a couple issues of government cheques back to the citizens.

  58. #358

    Default

    Quote Originally Posted by Marcel Petrin View Post
    Quote Originally Posted by Alex.L View Post
    Oh I'm not talking about Mason. Apparently certain aspects of the initial build may not be as 'expansion-ready' as they were meant to be and there is a certain level of rebuild they will have to be done on other things. Sorry for being purposely vague here. I want it build as quickly and properly as possible too, but it's not just a matter of budgeting for it and dusting off the old plans.
    Unfortunately, the SW portion is the hardest to expand/modify, as it's the concrete section that was essentially an experiment that they have not repeated since. I seriously doubt Alberta Infrastructure wants the expansion to be concrete, given how poorly the existing portion has performed. I know next to nothing about road building, but I would imagine that's going to present it's difficulties.
    I thought the concrete only went from west of rabbit hill road to the first overpass on the west side of the river (cameron heights)

  59. #359
    C2E SME
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    10,413

    Default

    It starts just east of 111 street and ends North of Lessard.

  60. #360
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    Concrete doesn't pose significant problems for adding a lane, asphalt however is more forgiving of freeze thaw cycles.
    What makes expansion expensive is adding lanes to the different bridges, especially if 4 lanes must be kept open.

  61. #361
    C2E SME
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    10,413

    Default

    Quote Originally Posted by sundance
    Concrete doesn't pose significant problems for adding a lane


    Yes it does. Completely different road base construction.

  62. #362
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,352

    Default

    I never considered compacting clay, mixing a soil cement base and compacting gravel that different.

  63. #363
    Administrator *
    Join Date
    Nov 2011
    Location
    Queen Mary Park, Edmonton
    Posts
    2,748

    Default

    Quote Originally Posted by Medwards View Post
    I guess I could kinda of understand that some things have changed, for example, the province now wants to consider Terwillegar/170st street as a provincial highway in the future, which will mean the Terwillegar/Henday interchange will need to be a full system to system interchange, which the current configuration wont support, nor would the 'ultimate' stage configuration... but we are probably 20+ years away from that.

    To relive the congestion problems, even if just temporary, can we just spend a bit of money and at least add a third lane from gateway to 127/135? This would make a world of difference while we continue to budget/plan for the full extension/modifications required for the long term.
    The ultimate stage does have a systems interchange. See page 2 of this pdf: https://www.edmonton.ca/documents/PD..._Maps_2011.pdf

  64. #364

    Default

    I wonder whether subsidized and modernized railways, double- or triple-tracked and fully electrified, are not the way to go in the long run. First for freight, and then for passenger transport.

    I suspect just in time delivery and truck transport in general, and air travel too for that matter, will turn out to be entirely oil-based, and will go down with oil.

  65. #365

    Default

    Rail is highly efficient, the tracks are possibly a lot lower maintenance than roadways, and generally designed for fast express routing. So it would be hard to beat - if people would use it. Even cleaner hybrid diesel electric would vastly cut pollution levels compared to trucking and bussing and planes.

  66. #366
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,603

    Default

    You boys on the Sunday evening sauce again?